The two Certified Hazardous Materials Manager (CHMM) chapters in Washington are pleased to provide Ecology with the attached Summary Addendum, following up on our August 2017 comments on the WAC 173-360A Preliminary Draft Rule. This Summary Addendum ...↓briefly summarizes some main points of our previous comments, and also addresses concerns identified during our follow-up discussions, including:
•Clarification regarding the role of on-the-job training for CHMMs being competent in UST site assessment, and
•Demonstration of equivalence of the CHMM credential in addressing state-specific certification requirements.
We look forward to providing any needed follow-up should any of the provided information require further clarification. Thank you for all your time and consideration.
↓
Comment 1: WAC 173-360A-0110(2)(a)(iii): Typo: The reference to 10 CFR. Part 501 is incorrect. It should be 10 CFR Part 50, consistent with 40 CFR 280.10(c)(4).
Comment 2: Requirement to use certified service provider: The proposed rule requ...↓ires the use of "service providers" for various aspects of UST activities, such as installation, upgrades, tightness testing, cathodic protection testing, periodic equipment inspections, etc. The proposed revision would add a new level of stringency to the certification requirements for "service providers." To some degree, the requirement to use certified providers is consistent with (but more prescriptive than) the approach in the current regulation, which requires certification to ensure that trained professionals are used for many UST activities. However, under the proposed rule certified service providers would be needed for several newly identified activities. For example, a service provider certified for "tightness testing or installation/repair" would be required to perform or supervise inspection of overfill prevention equipment under WAC 173-360A-0470, and to perform or supervise testing of release detection equipment (including testing of alarms, battery backups, probes and sensors, and hand-held electronic sampling equipment) under WAC 173-360A-0480. No nexus exists between tightness testing certification and inspection of electronic and other equipment associated with overfill protection or release detection. In looking at the International Code Council testing content for tank tightness certification (identified in WAC 173-360A-0930(2)(a) as UST Tightness Testing –U3), it is clear that the testing is not designed to assess proficiency in inspection or testing of alarms or overfill equipment. The requirement to use a service provider certified in tank tightness testing for these types of activities represents an expensive, unnecessary, and nongermane provision. This requirement should be deleted from WAC 173-360A-0470 and -0480.
↓
No attachments
Comment From:
Randy Dutton
2/02/18 @ 7:10 AM
Here is my official comment on the Department of Natural Resources Underground Storage Tank Rule.
I recommend Washington State Department of Ecology implement a building code change that retroactively requires liquid fuel private, commercial and ...↓government fuel stations, which are located in a potential flood or tsunami inundation zone, which for Grays Harbor County should be at least the 40' elevation line, have backflow preventers to prevent the entrance of any foreign solids or liquids. Also, all vents, fuel lines and electrical systems to support fuel operations shall be protected with a method designed and constructed to meet the structural requirements of debris impact commensurate with a tsunami flood.
Further, if the facility does not have a permanent onsite optional stand-by generator, that is protected from flood waters and/or debris impact, to operate the normal branch electrical system, there shall be a permanently installed predesigned water-proof electrical service entry for the normal branch electrical system that will allow a quick connection to a temporary electrical generator. This quick connection shall be installed inside of a permanent metal enclosure rated for this purpose and may be located on the exterior of the building.
Said water proofing should be designed for a minimum 28psi. (about 30 feet immersion depth).
---
Currently coastal Washington has fuel stations that WILL be submerged in a tsunami inundation. For example, I discovered that MASCO has 6 of 8 fuel facilities in Grays Harbor County that are in the inundation zone and they do NOT have backflow preventers. Further MASCO has a group of tanks at their main office that are on supports that will Not resist a surge and thus will add to contamination and fire threat). They are not alone. Research shows many of coastal fueling stations have vents that will NOT prevent contamination by flood waters and/or damage by surge debris. Not only does contaminated fuel present an environmental pollution threat and fire threat, but coastal Washington needs ALL the fuel we can get immediately following a megaquake and tsunami. We should not permit fuel to be contaminated when lives and recovery count on it.
I have asked my state representatives and state senator to promote this change and have gotten no response.
Regards,
Randy Dutton
↓
No attachments
Comment From:
Randy Dutton
2/02/18 @ 3:14 AM
To reduce pollution and save lives, I recommend Washington State Department of Ecology implement a building code change that retroactively requires private, commercial and government liquid fuel stations, which are located in a potential flood or tsu...↓nami inundation zone, which for Grays Harbor County should be at least the 40' elevation line, have back-flow preventers to prevent the entrance of any foreign solids or liquids. Also, all vents, fuel lines and electrical systems to support fuel operations shall be protected with a method designed and constructed to meet the structural requirements of debris impact commensurate with a tsunami flood.
Further, if the facility does not have a permanent onsite optional stand-by generator, that is protected from flood waters and/or debris impact, to operate the normal branch electrical system, there shall be a permanently installed predesigned water-proof electrical service entry for the normal branch electrical system that will allow a quick connection to a temporary electrical generator. This quick connection shall be installed inside of a permanent metal enclosure rated for this purpose and may be located on the exterior of the building.
Said water proofing should be designed for a minimum 28psi. (about 30 feet immersion depth).
---
Currently coastal Washington has fuel stations that WILL be submerged in a tsunami inundation. For example, I discovered that MASCO has 6 of 8 fuel facilities in Grays Harbor County that are in the inundation zone and they do NOT have backflow preventers. Further MASCO has a group of tanks at their main office that are on supports that will Not resist a surge and thus will add to contamination and fire threat). They are not alone. Research shows many of coastal fueling stations have vents that will NOT prevent contamination by flood waters and/or damage by surge debris. Not only does contaminated fuel present an environmental pollution threat and fire threat, but coastal Washington needs ALL the fuel we can get immediately following a megaquake and tsunami. We should not permit fuel to be contaminated when lives and recovery count on it.
↓
No attachments