Comment From: heidi Ahlstrand

9/30/20 @ 2:36 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Shirlene Harris

9/30/20 @ 2:35 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Thomas Diener

9/30/20 @ 2:32 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: James Mulcare

9/30/20 @ 2:25 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Hillary Tiefer

9/30/20 @ 2:23 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jörg Gaiser

9/30/20 @ 2:21 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: James Klein

9/30/20 @ 2:20 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jeannie Finlay-Kochanowski

9/30/20 @ 2:20 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jim Brunton

9/30/20 @ 2:19 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Amy Platt

9/30/20 @ 2:18 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Gerritt Elizabeth

9/30/20 @ 2:16 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Debbie Spear

9/30/20 @ 2:15 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: r wood

9/30/20 @ 2:15 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Stephen Pacios

9/30/20 @ 2:14 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Mark Lundholm

9/30/20 @ 2:14 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

Any continue...

This new Draft Supplemental Environmental Impact Statement represents some important improvements in evaluating the true climate impacts of this facility, including addressing the likelihood that methanol produced by this facility will be used as transportation fuel, despite deliberate efforts by NWIW to mislead your agency and the public otherwise. And while the SEIS has made some necessary adjustments in the methane leakage rates, the rates continue to be low estimates given the widespread underreporting of leaks. However, even with the unreasonable assumptions about the single-sourcing of gas from British Columbia, as well as the unrealistically low leakage estimates for that source, the analysis confirms that NWIWs proposed facility would be enormously polluting.

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sue Wolfe

9/30/20 @ 2:12 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Emily Van Alyne

9/30/20 @ 2:12 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Kevin Kimmel

9/30/20 @ 2:12 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jan Mustain

9/30/20 @ 2:10 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: helen carrick

9/30/20 @ 2:10 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Cheryl Harrison

9/30/20 @ 2:10 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Melanie Branchflower

9/30/20 @ 2:10 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Daniel Grimley

9/30/20 @ 2:08 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Derek Gendvil

9/30/20 @ 2:08 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: M Aufrecht

9/30/20 @ 2:07 AM
Stop the Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama. NWIWs proposed facility would be enormously polluting in Washington State.

The argument that If we dont build it, someone else will, is a terrible reason to move in the w...

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: MaryAnn Murphy

9/30/20 @ 2:07 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Paul McCollum

9/30/20 @ 2:06 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Roberta Rominger

9/30/20 @ 2:06 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Betsy Gillaspy

9/30/20 @ 2:03 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Larry Maes

9/30/20 @ 2:02 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Cheryl Henley

9/30/20 @ 2:01 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Daniel Villa

9/30/20 @ 1:59 AM
Dear Mr. Doenges,

I was outside with the Protectors of the Salish Sea when they asked you, pleaded with you, begged you, to help stop fossil fuel expansion here in Washington State. To protect us and the future for our descendants. And you replied tha...

So it's confusing to me when I see an SEIS from Ecology that acknowledges the climate damage that the proposed methanol plant will cause in the first half then sings its hypothetical virtues in the next. How can the alleged benefits of a facility be based off of theoretical displacements of other fossil fuels, and their methods of use, that are far from being under the control of Northwest Innovation Works, Washington State, or even the USA?

How does this proposal fit into Washington State's own goals and obligations of reducing our local greenhouse gas emissions? I understand this plant would increase our state's emissions by 10% alone. The proposed facility will be a blight on the small town of Kalama, the Colombia River, the state of Washington.

Where will the enormous quantities of methane for this project originate? Up in Canada where the industry's self-reported leakage rates are allegedly lower than here in the US? Studies have shown that the natural gas industry is leaking from every possible place along the fracking, distribution and end-use chain. It's a climate disaster.

I understand that another pipeline would have to be built across the state, north to south. Are the climate impacts of building this pipeline taken into account? How much will that pipeline will leak? What habitats and waterways will it obstruct and damage along the way?

I don't have to tell you how much worse methane is as a greenhouse gas than carbon. Or maybe I do: at least 86 times worse over a 20 year period. Twenty years. Twice as much time than what the last Intergovernmental Panel on Climate Change report says we have left to move swiftly and radically away from fossil fuels. Yet if you approve this gigantic methanol facility it will be moving in the exact opposite direction of where we need to be going, and for forty years nonetheless, the anticipated life expectancy of the facility.

So once again I will ask you, plead with you, and beg you to use your power to put an end to this disastrous proposal once and for all.

For a better tomorrow,

Daniel Villa

No attachments

Comment From: Andrea Faste

9/30/20 @ 1:59 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Kurt Sacha

9/30/20 @ 1:57 AM
Attachments:

Comment From: Linda Granato

9/30/20 @ 1:57 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Nancy Hauer

9/30/20 @ 1:57 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Scott Bishop

9/30/20 @ 1:56 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Catherine Federman

9/30/20 @ 1:55 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Todd Clark

9/30/20 @ 1:54 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Amy Olsen

9/30/20 @ 1:53 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Betsy Cousins-Coleman

9/30/20 @ 1:53 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: bob rodgers

9/30/20 @ 1:51 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Margaret Bright

9/30/20 @ 1:49 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Saundra Curteman

9/30/20 @ 1:48 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Joseph Lawson

9/30/20 @ 1:48 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Wendy Bowman

9/30/20 @ 1:48 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Diane Kokowski

9/30/20 @ 1:48 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Kathryn Willson

9/30/20 @ 1:48 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Marianne Corona

9/30/20 @ 1:45 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jody Gibson

9/30/20 @ 1:44 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Joanna Chesnut

9/30/20 @ 1:44 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Cheryl Biale

9/30/20 @ 1:43 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Julie Stone

9/30/20 @ 1:43 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: I. DANILOVS

9/30/20 @ 1:42 AM
Please oppose this project.
No attachments

Comment From: Thom Lufkin

9/30/20 @ 1:42 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Anne Hawkins

9/30/20 @ 1:41 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Richard Ress

9/30/20 @ 1:41 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Linda Horst

9/30/20 @ 1:41 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Linda Wasserman

9/30/20 @ 1:41 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Desiree Nagyfy

9/30/20 @ 1:39 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Robbi Chisholm

9/30/20 @ 1:39 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sandra Ciske

9/30/20 @ 1:39 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Michael Williams

9/30/20 @ 1:38 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Maureen Lang

9/30/20 @ 1:37 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: David Dart

9/30/20 @ 1:37 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Carol Olivier

9/30/20 @ 1:37 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution. The rule for good citizenry always is leave somewhere better than how you found it we have to be responsible for the world our children inherit and reduce carbon emissions.
No attachments

Comment From: John Schenck

9/30/20 @ 1:37 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Tom Lux

9/30/20 @ 1:37 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Fawn King

9/30/20 @ 1:36 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Janet Riordan

9/30/20 @ 1:36 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Melissa Weissman

9/30/20 @ 1:35 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: JL Angell

9/30/20 @ 1:35 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Lloyd Hedger

9/30/20 @ 1:34 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Shauna Boyd

9/30/20 @ 1:34 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Klaudia Englund

9/30/20 @ 1:33 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Janna Rolland

9/30/20 @ 1:33 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Christopher Rahm

9/30/20 @ 1:33 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Linda Studley

9/30/20 @ 1:32 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Joan Christensen

9/30/20 @ 1:30 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Janine Watts

9/30/20 @ 1:30 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Greg Goodwin

9/30/20 @ 1:29 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Anonymous Anonymous

9/30/20 @ 1:29 AM
We are a decade past due to begin to build a sustainable infrastructure for the future. Biden will start to provide green jobs and build it out. Don't take us backwards to the danger of a climate crisis, but keep it in the ground!
No attachments

Comment From: Karen Berntsen

9/30/20 @ 1:29 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Emele Clothier

9/30/20 @ 1:28 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: John S

9/30/20 @ 1:27 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Cynthia Babcock

9/30/20 @ 1:27 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Steven Biggio

9/30/20 @ 1:27 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Coleen Anderson

9/30/20 @ 1:26 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Maria Asteinza

9/30/20 @ 1:26 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jani Doctor

9/30/20 @ 1:26 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Alan Moen

9/30/20 @ 1:25 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Julie Harris

9/30/20 @ 1:24 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Kim Smith

9/30/20 @ 1:24 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Dorothy Hall

9/30/20 @ 1:23 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jim Rodrigue

9/30/20 @ 1:23 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: stan wagner

9/30/20 @ 1:22 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
It is time for the state to step up to protect its citizens and not the shareholders in this project.
No attachments

Comment From: RICHARD STERN

9/30/20 @ 1:22 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Susan Schmidt

9/30/20 @ 1:22 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Phillip Norman

9/30/20 @ 1:22 AM
It is purely evil to pillage North American wilderness, forever ruining its habitability. This is in disdain for present inhabitants and those in the future needing habitation on a hotter planet. The grab is merely to enrich a few greedy investors an...

The future of life on Earth must trend better, not worse, as planned in cities of more-progressive China (https://www.c40.org/researches/constructing-a-new-low-carbon-future-china). Don't foolishly accept that export of stolen methanol to China makes any sense.
No attachments

Comment From: Arnold Strang

9/30/20 @ 1:21 AM
THIS WILL REQUIRE A WW2 SCALE EFFORT!!!!

WE HAVE TO GET THIS RIGHT OR ITS ALL OVER!!!!

WE ARE OUT OF TIME!!!!

NOTHING IS MORE IMPORTANT!!!!

Climate change is an existential threat to human civilization if not humanity itself. We are out of time. The to...

Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Draft Supplemental Environmental Impact Statement represents some important improvements in evaluating the true climate impacts of this facility, including addressing the likelihood that methanol produced by this facility will be used as transportation fuel, despite deliberate efforts by NWIW to mislead your agency and the public otherwise. And while the SEIS has made some necessary adjustments in the methane leakage rates, the rates continue to be low estimates given the widespread underreporting of leaks. However, even with the unreasonable assumptions about the single-sourcing of gas from British Columbia, as well as the unrealistically low leakage estimates for that source, the analysis confirms that NWIWs proposed facility would be enormously polluting.

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments