Comment From: Theresa DeLuca

9/19/20 @ 12:55 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Eileen Juric

9/19/20 @ 12:53 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Edward Kaeufer

9/19/20 @ 12:51 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Polly Taylor

9/19/20 @ 12:50 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jessica Cresseveur

9/19/20 @ 12:49 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Doris Raspa

9/19/20 @ 12:48 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Nancy Hayden

9/19/20 @ 12:47 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: K o

9/19/20 @ 12:47 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Bob Schmelter

9/19/20 @ 12:46 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Greg Espe

9/19/20 @ 12:45 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Warren Gwold

9/19/20 @ 12:45 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Barbara Wos-elledge

9/19/20 @ 12:45 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Tracey Bonner

9/19/20 @ 12:44 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Maria Venidis

9/19/20 @ 12:44 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Donna Hendrix

9/19/20 @ 12:43 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: margie maddux

9/19/20 @ 12:43 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Richard Hernandez

9/19/20 @ 12:43 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Bobette Jones

9/19/20 @ 12:43 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: John Guros

9/19/20 @ 12:42 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: sandra garcia

9/19/20 @ 12:42 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Michael Brandes

9/19/20 @ 12:42 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Michael Nelson

9/19/20 @ 12:41 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Grace Miller

9/19/20 @ 12:41 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Linda Porter

9/19/20 @ 12:41 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Steve Graff

9/19/20 @ 12:39 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Andrew Gendaszek

9/19/20 @ 12:39 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Dave Baine

9/19/20 @ 12:39 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Diane Basile

9/19/20 @ 12:39 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Eric Zinn

9/19/20 @ 12:39 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Robert Rice

9/19/20 @ 12:38 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Marcia Gowing

9/19/20 @ 12:38 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Anita Gwinn

9/19/20 @ 12:37 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Holly Gadbaw

9/19/20 @ 12:37 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: JERRY BALABANIAN

9/19/20 @ 12:37 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: James Soares

9/19/20 @ 12:37 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sheila Massoni

9/19/20 @ 12:37 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sandi Bond

9/19/20 @ 12:36 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Barbara Houk

9/19/20 @ 12:34 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Karen Lane

9/19/20 @ 12:34 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Billie Allen

9/19/20 @ 12:33 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Gin Dammann

9/19/20 @ 12:32 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: t Mo

9/19/20 @ 12:32 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Deborah Francis

9/19/20 @ 12:32 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Deborah Mangold

9/19/20 @ 12:32 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution. It has never been more important to protect our environment.
No attachments

Comment From: PATRICIA SIMON

9/19/20 @ 12:32 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Linda Gusch

9/19/20 @ 12:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Don Adair

9/19/20 @ 12:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: E Scantlebury

9/19/20 @ 12:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Rebecca Levinson

9/19/20 @ 12:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jennifer Webster

9/19/20 @ 12:30 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Nancy Hauer

9/19/20 @ 12:30 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Belinda Colley

9/19/20 @ 12:30 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Adam Stein

9/19/20 @ 12:30 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Thomas Dawley

9/19/20 @ 12:29 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Thomas Swoffer

9/19/20 @ 12:29 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Lori Whittaker

9/19/20 @ 12:29 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Shelley Simcox

9/19/20 @ 12:28 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Tim Rettmann

9/19/20 @ 12:28 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Niki Vogt

9/19/20 @ 12:27 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Berl Nussbaum

9/19/20 @ 12:25 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Gary Ranz

9/19/20 @ 12:25 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.

In times of an oil glut, decreased exploration and US the leading oil producer; why would we need increased capacity to make a gasoline additive? We should be moving away from fossil fuels and toward more sustainable (solar, wind & continued hydro) infrastructure.
No attachments

Comment From: Prof Tartaglia

9/19/20 @ 12:24 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Elli Harron

9/19/20 @ 12:24 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sharon Baker

9/19/20 @ 12:23 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.

When all the trees and animals are dead and all the air, land and water polluted you will then realize you and your progeny can't eat money...........
No attachments

Comment From: Sue Huseman

9/19/20 @ 12:23 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: andrea adams

9/19/20 @ 12:23 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: fran merker

9/19/20 @ 12:22 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jessie Friedmann

9/19/20 @ 12:22 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Michelle Sewald

9/19/20 @ 12:22 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: michael pyle

9/19/20 @ 12:21 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Kerry McCool

9/19/20 @ 12:21 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Bob Leppo

9/19/20 @ 12:20 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Guadalupe Yanez

9/19/20 @ 12:20 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Linda Woodall

9/19/20 @ 12:20 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Roger Clark

9/19/20 @ 12:20 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Daniel Grimley

9/19/20 @ 12:18 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: fay forman

9/19/20 @ 12:18 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Liisa Wale

9/19/20 @ 12:18 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Katz Ro

9/19/20 @ 12:17 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Donna Niles

9/19/20 @ 12:17 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Randall Daugherty

9/19/20 @ 12:17 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Donna Meyers

9/19/20 @ 12:17 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Lorraine Martinez

9/19/20 @ 12:17 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Mona Harris

9/19/20 @ 12:16 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Carolyn Finch

9/19/20 @ 12:16 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Beverly Rice

9/19/20 @ 12:15 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Elizabeth Weiss

9/19/20 @ 12:14 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: l hurd

9/19/20 @ 12:13 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sandi Bond

9/19/20 @ 12:13 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Tyra Pellerin

9/19/20 @ 12:13 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sharon feeney

9/19/20 @ 12:12 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: steve lucas

9/19/20 @ 12:12 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: virgil ripley

9/19/20 @ 12:12 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Gail McMullen

9/19/20 @ 12:11 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Alissa Andersson

9/19/20 @ 12:11 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Linda Withrow

9/19/20 @ 12:11 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Robert Gigliotti

9/19/20 @ 12:11 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Janice Dutka

9/19/20 @ 12:10 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Karen Koch

9/19/20 @ 12:10 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jennifer Buchanan

9/19/20 @ 12:09 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.