Comment From: Paul Bigelow

9/19/20 @ 3:09 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Deborah Hagen-Lukens

9/19/20 @ 3:08 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Buck McAdoo

9/19/20 @ 3:07 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Richard Schmitt

9/19/20 @ 3:06 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Mary Easton

9/19/20 @ 3:05 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: John MD

9/19/20 @ 3:04 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Kara Harms

9/19/20 @ 3:03 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Katherine Wright

9/19/20 @ 3:01 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Laura Finkelstein

9/19/20 @ 3:01 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Gordon Wheat

9/19/20 @ 3:01 AM
Kalama Manufacturing and Marine Export Facility Second Supplemental EIS

As a longtime resident of Washington, as a physician with a public health background and as a citizen of the world, I need to add my comments on the proposed Kalama Manufacturing ...
As a member of the Washington Academy of Family Physicians Public Health Committee, I am very concerned about the air and water discharges that would result from this refinery. The Columbia River Aquifer is very sensitive and could be irreparably damaged.
The proposed methanol refinery would lead to millions of tons of greenhouse gas pollution each year, and once built it could not be shut down for the life of the refinery, some 30-40 years. Ecology's own analysis shows that the project would produce 4.6 million tons of carbon pollution each year, or more. This level of pollution is profoundly inconsistent with achieving Washington's climate goals, protecting Washington's Shorelines, and charting a path to keep global temperature rise below 2 degrees C.
In 2018 and 2019, NWIW informed potential investors that methanol from the planned refinery could be burned as fuel overseas, in sharp contrast to claims NWIW made to local and state regulators that the methanol would only be used to manufacture plastic. Now, Ecology's analysis contemplates 40 percent of the methanol being burned, yielding 2 million tons of carbon pollution each year.
Washington State needs to take a stand and not make a commitment to the fossil fuel industry to allow the industry to use our land and our shoreline to ship methanol overseas under long term contracts.
The risk to our environment in Washington from potential leaks and discharge from the plant damaging our fragile Columbia River Shoreline is not acceptable. Ecology should deny the Shorelines permit for the refinery.
Why should Washington State take the risks to our environment and the health of our population for a small number of jobs, only to provide fuel for pollution in China and elsewhere. The voters of the state of Washington should say that we are not going to sacrifice our health and our environment to further the destruction of our planet. We are seeing the early effects of climate change now, and the effects will be exponentially worse in 10-20 years, but the plant once built will be irreversible. Please let the voices of reason from the citizens of this state be heard before finalizing the Second Supplemental EIS.
Sincerely,
Gordon Wheat MD
WAFP Public Health Committee
Washington State Department of Health One Health Taskforce and Workgroup

No attachments

Comment From: Russell Maier

9/19/20 @ 3:01 AM
As a physician, I oppose this plant for three reasons:

1) Climate change has a direct effect on the health of the public, and this plant, along with the transportation of its raw materials and product will produce greenhouse gas emissions for the next...

2) The future is not more carbon based fuel. As our state demonstrates, solar, wind, and hydropower can provide the power needed for the future. The SEIS argument relies on a future that reflects the past. Given that renewables are rapidly replacing carbon based fuels it is speculative, not fact based, to argue that one fossil based fuel would 'displace' other fossil based fuels.

3) We live in the same world. Even if methanol fuel is exported, those carbon emissions will contribute to global warming. Do we want to be the state where we export our products to damage others? I think not.
No attachments

Comment From: mark Levin

9/19/20 @ 2:59 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

It is simply...

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

We need to move away from fossil fuels. This plant will only add pollution and is not necessary. Please do not approve this plant.
No attachments

Comment From: Norman Sandel

9/19/20 @ 2:59 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jennifer England

9/19/20 @ 2:59 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Eric Moyle

9/19/20 @ 2:57 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Dean Webb

9/19/20 @ 2:56 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Mallory Robinson

9/19/20 @ 2:55 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Lee Miller

9/19/20 @ 2:55 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: patrick BOOT

9/19/20 @ 2:55 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Inger Acking

9/19/20 @ 2:55 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Dawn Aiken

9/19/20 @ 2:54 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Mary Cormier

9/19/20 @ 2:52 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Patricia Wilson

9/19/20 @ 2:52 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Patricia Wilson

9/19/20 @ 2:51 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Leonard Obert

9/19/20 @ 2:50 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jon Vlaskamp

9/19/20 @ 2:50 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Julie Roe

9/19/20 @ 2:47 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Vic Burton

9/19/20 @ 2:47 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Max Feldman

9/19/20 @ 2:44 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Janice Schuch

9/19/20 @ 2:44 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Nancy Shaw

9/19/20 @ 2:44 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Judy Dirks

9/19/20 @ 2:44 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Clivonne Corbett

9/19/20 @ 2:43 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Monica Beyer

9/19/20 @ 2:43 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Eileen Schepers

9/19/20 @ 2:41 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Stefanie Gibbs

9/19/20 @ 2:40 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Michele Reynolds

9/19/20 @ 2:40 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Kelly Hickman

9/19/20 @ 2:39 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

As a Washingtonian, I care about the health of our land and the creatures (including us humans) that live on it. Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Debbie Spear

9/19/20 @ 2:39 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Karen Weis

9/19/20 @ 2:38 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Joan Bowers

9/19/20 @ 2:38 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Francesca Ritson

9/19/20 @ 2:38 AM
The Kalama methanol producing plant is a bad idea for a vulnerable site to environmental pollution. The premise, that it should be considered to do less environmental harm as the plant will be built somewhere else, is specious and just wrong. There ...

Washington is starting to be a leader on climate change mitigation, this plant would definitely be a step in the wrong direction.
No attachments

Comment From: James Mulcare

9/19/20 @ 2:37 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sandra Gehri-Bergman

9/19/20 @ 2:36 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Maureen Porcelli

9/19/20 @ 2:35 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Robert Williamson

9/19/20 @ 2:35 AM
Robert Williamson
No attachments

Comment From: Amy Kiba

9/19/20 @ 2:35 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jennifer Gindt

9/19/20 @ 2:35 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Marlene Hayden

9/19/20 @ 2:35 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Elizabeth Grant

9/19/20 @ 2:34 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Rocio lario

9/19/20 @ 2:32 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Julian De Puma

9/19/20 @ 2:32 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: JL Angell

9/19/20 @ 2:32 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Loretta Davolos

9/19/20 @ 2:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Beth Brunton

9/19/20 @ 2:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Gretchen Metz

9/19/20 @ 2:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Marbella Brown

9/19/20 @ 2:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Derek Gendvil

9/19/20 @ 2:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Javier Rivera-Diaz

9/19/20 @ 2:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jennifer Brandon

9/19/20 @ 2:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: April Atwood

9/19/20 @ 2:25 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: mia heavyrunner

9/19/20 @ 2:25 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Dominica Lord-Wood

9/19/20 @ 2:25 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution. Please respect the tribes of both countries who have spoken against this threat to our land and environment.
No attachments

Comment From: Keith Cowan

9/19/20 @ 2:24 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Dennis Pennell

9/19/20 @ 2:23 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Fawn King

9/19/20 @ 2:23 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Carrie Heron

9/19/20 @ 2:22 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jamie Shields

9/19/20 @ 2:20 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Marian Carter

9/19/20 @ 2:20 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: carolyn powers

9/19/20 @ 2:19 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Tim Duda

9/19/20 @ 2:18 AM
With the unreasonable assumptions about the single-sourcing of gas from British Columbia, as well as the unrealistically low leakage estimates for that source, the analysis confirms that NWIWs proposed facility would be enormously polluting.

Despite m...

This analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: r g

9/19/20 @ 2:17 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Phil Hembury

9/19/20 @ 2:17 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: mary kerfoot

9/19/20 @ 2:17 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Merlin Wilson

9/19/20 @ 2:17 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sharon Hurley

9/19/20 @ 2:16 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Samantha Orszulak

9/19/20 @ 2:14 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Christopher Murphy

9/19/20 @ 2:14 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Patricia Martinez

9/19/20 @ 2:13 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Richard Curtis

9/19/20 @ 2:12 AM
Washington State and the northwest part of our nation are known for clean air and water. Lately our air quality has been destroyed by smoke from fires that are the result of record temperatures and drought. As our climate continues to change we mus...

Thank you for your work to protect Washingtons environment and recognition that the previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama are inaccurate and inadequate.

This new Draft Supplemental Environmental Impact Statement represents some important improvements in evaluating the true climate impacts of this facility, including addressing the likelihood that methanol produced by this facility will be used as transportation fuel, despite deliberate efforts by NWIW to mislead your agency and the public otherwise. And while the SEIS has made some necessary adjustments in the methane leakage rates, the rates continue to be low estimates given the widespread underreporting of leaks. However, even with the unreasonable assumptions about the single-sourcing of gas from British Columbia, as well as the unrealistically low leakage estimates for that source, the analysis confirms that NWIWs proposed facility would be enormously polluting.

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Ed Taylor

9/19/20 @ 2:12 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Patrick Conn

9/19/20 @ 2:11 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been fundamentally inaccurate and woefully ...

This new Draft Supplemental Environmental Impact Statement represents some important and absolutely required improvements in evaluating the true climate impacts of this facility, including addressing the likelihood that methanol produced by this facility will be used as transportation fuel, despite deliberate efforts by NWIW to mislead your agency and the public otherwise. And while the SEIS has made some necessary adjustments in the methane leakage rates, the rates continue to be low estimates given the widespread underreporting of leaks. However, even with the unreasonable assumptions about the single-sourcing of gas from British Columbia, as well as the unrealistically low leakage estimates for that source, the analysis confirms that NWIWs proposed facility would be enormously polluting.

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis CONTINUES TO BE MISLEADING and TRUMP-CORRUPT LEVEL CORPORATE BIASED and FICTIONAL, BASED WHOLLY ON SPECULATION and UNENFORCEABLE ASSUMPTIONS, RATHER THAN SCIENTIFIC FACTS (typical of the current BALD-FACED LYING, FACTS IGNORING DONALD TRUMP and REPUBLICAN SENATOR-LED REGIME'S REPREHENSIBLE POLITICAL CORRUPTION. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Anthony Long

9/19/20 @ 2:10 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Nancy Nelson

9/19/20 @ 2:09 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: David Mayer

9/19/20 @ 2:09 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

To continue to utilize fracked gas reserves in this way will continue to negatively impact our climate, as evidenced by the number and destruction of wild fires this summer. It's far past time to focus our efforts in more sustainable directions. They are known and should be supported. not more of the same...

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Julia Brasch

9/19/20 @ 2:07 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Brie Gyncild

9/19/20 @ 2:07 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Alan Hardcastle

9/19/20 @ 2:06 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Brandie Deal

9/19/20 @ 2:05 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Teresa Allen

9/19/20 @ 2:03 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Virginia Rice

9/19/20 @ 2:02 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Robyn Pape

9/19/20 @ 2:02 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sasha Frisbie

9/19/20 @ 2:00 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Audrey Meade

9/19/20 @ 2:00 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Michelle Macy

9/19/20 @ 1:59 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Chris Drumright

9/19/20 @ 1:58 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: William Phillips

9/19/20 @ 1:58 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Barclay Hauber

9/19/20 @ 1:57 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jonah Griffith

9/19/20 @ 1:56 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Beth Levin

9/19/20 @ 1:55 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments