Comment From: Adele Reynolds

9/19/20 @ 4:47 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Nancy Lewis

9/19/20 @ 4:47 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: R McClain

9/19/20 @ 4:47 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Dr Demian

9/19/20 @ 4:42 AM
Hi:

The previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington was inaccurate and inadequate.

The new Draft Supplemental Environmental Impact Statement has some important improvements, the ...

Despite these marginal improvements, it's dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades.

Further, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the largest sources of climate pollution in Washington.

Ecology should dismiss the speculative basis that this project could displace even more polluting facilities. Instead, it should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project, that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

Washington MUST DENY NWIWs proposal to build and operate this dangerous methanol refinery in Kalama.

Thank you.
Dr. Demian
No attachments

Comment From: Andrew Jackson

9/19/20 @ 4:42 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: James Klein

9/19/20 @ 4:41 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.

This, like numerous other issues (climate change, food labeling, gun safety, immigration reform, prison reform, education reform, short-term lending regulation, healthcare reform, banking regulation, opioid regulation) remains a vexing problem primarily due to corporations' ability to curry favor with elected officials. The corrupting influence of money in our political system is undermining our democratic traditions and discouraging Americans from voting and/or running for office. This ominous development may well end our experiment in representative democracy unless we alter this decades-long trend. For the sake of the republic, we must amend the US Constitution to state that corporations are not people (and do not have constitutional rights) and money is not speech (and thus can be regulated by state and/or federal campaign finance laws). Short of accomplishing this, no other reform of significance will be achieved. The moneyed interests will turn any reform to their benefit, often at the expense of the nation as a whole.
No attachments

Comment From: Clay Dennis

9/19/20 @ 4:41 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Harold Mortensen

9/19/20 @ 4:39 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Alfred Ferraris

9/19/20 @ 4:38 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Brian Gibbons

9/19/20 @ 4:38 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: CJ Livingston

9/19/20 @ 4:38 AM
Thank you for your work to protect Washingtons environment.

The new Draft Supplemental Environmental Impact Statement represents some important improvements in evaluating the true climate impacts of this facility, including addressing the likelihood t...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Valerie Holland

9/19/20 @ 4:38 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Andrea Faste

9/19/20 @ 4:37 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Carol Stanley

9/19/20 @ 4:36 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Lisa Halpern

9/19/20 @ 4:35 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Barbara Gray

9/19/20 @ 4:35 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Janet Hedgepath

9/19/20 @ 4:34 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Linda Hanlon

9/19/20 @ 4:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Carole H

9/19/20 @ 4:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Joanne Collens

9/19/20 @ 4:29 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Brita Mjos

9/19/20 @ 4:27 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: debbie thorn

9/19/20 @ 4:27 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: James Terry

9/19/20 @ 4:26 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Fred Thaller

9/19/20 @ 4:23 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Janette Cunningham

9/19/20 @ 4:22 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Abigail Houghton

9/19/20 @ 4:21 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Daniela Birch

9/19/20 @ 4:19 AM
I oppose the construction of the Kalama Manufacturing and Marine Export Facility. The consensus on the world's scientists is that stabilization of the earth's climate requires reduction of greenhouse gas emission to net zero in less than a decade. ...
No attachments

Comment From: John Samaras

9/19/20 @ 4:19 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sandra Perkins

9/19/20 @ 4:18 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: David Arntson

9/19/20 @ 4:17 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jackie Stolfi

9/19/20 @ 4:17 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Valerie Mehring

9/19/20 @ 4:17 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Carol Boudreau

9/19/20 @ 4:13 AM
I live on the Columbia River downstream from Kalama and believe that what happens there will not stay there. I am writing to ask you To DENY the shoreline conditional use permit for NW Innovation Works gas to methanol plant and reject the refinery. W...
No attachments

Comment From: Jennifer Pletcher

9/19/20 @ 4:12 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Kristy Knickrehm

9/19/20 @ 4:11 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: MaryJo Wilkins

9/19/20 @ 4:10 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: marta cramer

9/19/20 @ 4:08 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Diann Sheldon

9/19/20 @ 4:08 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.

Thank you for your time and attention.
No attachments

Comment From: Jerry Banks

9/19/20 @ 4:07 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Ken mincin

9/19/20 @ 4:07 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Janalee Roy

9/19/20 @ 4:04 AM
I already fear that my two children--both in their mid-thirties--will not live to see their natural deaths, as they will die from the effects of climate change much sooner than their "4 score and 10." Even I--a 69-year-old woman--will likely die fro...
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Draft Supplemental Environmental Impact Statement represents some important improvements in evaluating the true climate impacts of this facility, including addressing the likelihood that methanol produced by this facility will be used as transportation fuel, despite deliberate efforts by NWIW to mislead your agency and the public otherwise. And while the SEIS has made some necessary adjustments in the methane leakage rates, the rates continue to be low estimates given the widespread underreporting of leaks. However, even with the unreasonable assumptions about the single-sourcing of gas from British Columbia, as well as the unrealistically low leakage estimates for that source, the analysis confirms that NWIWs proposed facility would be enormously polluting.

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: P Elle

9/19/20 @ 4:03 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Celeste Watt

9/19/20 @ 4:03 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sharon Fox

9/19/20 @ 4:01 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Ursula Trimble

9/19/20 @ 4:01 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jim Haley

9/19/20 @ 4:00 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Kirk Leonard

9/19/20 @ 3:58 AM
The Kalama methanol refinery would be one of the top polluters in Washington State. The SSEIS analysis estimates the Kalama Manufacturing and Marine Export facility would produce 4.6 million tons of carbon pollution each year. This level of polluti...

We the people in this state depend on these resources, not to be used for producing plastics or fuel for China.

I oppose this project, please deny the permit.
No attachments

Comment From: Chris Knutson

9/19/20 @ 3:58 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Rae Newman

9/19/20 @ 3:56 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Linda Dodson

9/19/20 @ 3:55 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: DeLorse Lovelady

9/19/20 @ 3:55 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Marjorie Green

9/19/20 @ 3:55 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Marc Gregory

9/19/20 @ 3:55 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Rachel Scarlata

9/19/20 @ 3:54 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Beth Kessinger

9/19/20 @ 3:53 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: John Merrill

9/19/20 @ 3:53 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Chris Hazynski

9/19/20 @ 3:52 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Nancy Jacobs

9/19/20 @ 3:49 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Les Rees

9/19/20 @ 3:49 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Teresia LaFleur

9/19/20 @ 3:49 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Judith Cohen

9/19/20 @ 3:48 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sally Madigan

9/19/20 @ 3:47 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Breana Driscoll

9/19/20 @ 3:46 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Patricia Freeman

9/19/20 @ 3:43 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jonah Hister

9/19/20 @ 3:42 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Christian chabot

9/19/20 @ 3:42 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Dagmar Fabian

9/19/20 @ 3:41 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Ericka Kohn

9/19/20 @ 3:40 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Claire Aiello

9/19/20 @ 3:39 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Alex Bennett

9/19/20 @ 3:37 AM
With all the fires this season, it is obvious we must work towards a greener Washington. I care deeply about our state and it's natural resources. Climate change is a clear and present threat. Please take action to reverse climate change by opposing ...

Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Draft Supplemental Environmental Impact Statement represents some important improvements in evaluating the true climate impacts of this facility, including addressing the likelihood that methanol produced by this facility will be used as transportation fuel, despite deliberate efforts by NWIW to mislead your agency and the public otherwise. And while the SEIS has made some necessary adjustments in the methane leakage rates, the rates continue to be low estimates given the widespread underreporting of leaks. However, even with the unreasonable assumptions about the single-sourcing of gas from British Columbia, as well as the unrealistically low leakage estimates for that source, the analysis confirms that NWIWs proposed facility would be enormously polluting.

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sergey Ulanov

9/19/20 @ 3:36 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jeff Green

9/19/20 @ 3:32 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Nancy Gleim

9/19/20 @ 3:32 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Kris Brown

9/19/20 @ 3:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Antonio Lucero

9/19/20 @ 3:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Agnieszka Beletsky

9/19/20 @ 3:30 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Diane Sullivan

9/19/20 @ 3:30 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Barbara Fristoe

9/19/20 @ 3:28 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Mary Onufer

9/19/20 @ 3:28 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: jeri harris

9/19/20 @ 3:27 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Karen Williams

9/19/20 @ 3:26 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Nicole Gillespy

9/19/20 @ 3:25 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Michelle Stepp

9/19/20 @ 3:24 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Lakota Crystal

9/19/20 @ 3:20 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: TOBY SMITH

9/19/20 @ 3:20 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Lucy Ostrander

9/19/20 @ 3:20 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Rick K

9/19/20 @ 3:20 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Linda Luke

9/19/20 @ 3:18 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Alana Hendrickson

9/19/20 @ 3:17 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Tiffany Dodge

9/19/20 @ 3:16 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Lauri Lindquist

9/19/20 @ 3:16 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Tonya coyne

9/19/20 @ 3:15 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Linda Murtfeldt

9/19/20 @ 3:14 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sara Hoerlein

9/19/20 @ 3:12 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: James Bernard

9/19/20 @ 3:12 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Phil Massengill

9/19/20 @ 3:12 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Kimberly Teraberry

9/19/20 @ 3:11 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Jason Crawford

9/19/20 @ 3:11 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Lynne Bannerman

9/19/20 @ 3:10 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Liz Janssen

9/19/20 @ 3:09 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments