Comment From: Steven Wright

9/21/20 @ 6:45 AM
The proposed Kalama methanol plant presents a clear danger to life. Methane escapement from the well heads, transmission lines, and proposed plant should not be ignored. Green house gasses from the plant will negatively effect our environment and wil...
No attachments

Comment From: Linda Orgel

9/21/20 @ 6:29 AM
I heard that the Grays Harbor Audubon comment letter did not upload so I am trying again.
Attachments:

Comment From: Marcia Pearson

9/21/20 @ 6:27 AM
You must not allow this enterprise to be iniated. The disastrous effects are clear: dangerous pollution, draining of precious aquifers, the largest facility for fracking, the destructive consequences on health and safety for land, water, environment...
No attachments

Comment From: John Barger

9/21/20 @ 6:24 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Lindsay Ward

9/21/20 @ 6:22 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: virginia alexander

9/21/20 @ 6:21 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Carol Whitehurst

9/21/20 @ 6:18 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Dolly Sutherland

9/21/20 @ 6:16 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Mary Masters

9/21/20 @ 6:13 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Forest Shomer

9/21/20 @ 6:13 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Liane Thomas

9/21/20 @ 5:56 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Laura Zerr

9/21/20 @ 5:52 AM
Do not allow NWIW greenwash the Kalama methanol project! The environmental impact of constructing this facility is too great! Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of North...

This new Draft Supplemental Environmental Impact Statement represents some important improvements in evaluating the true climate impacts of this facility, including addressing the likelihood that methanol produced by this facility will be used as transportation fuel, despite deliberate efforts by NWIW to mislead your agency and the public otherwise. And while the SEIS has made some necessary adjustments in the methane leakage rates, the rates continue to be low estimates given the widespread underreporting of leaks. However, even with the unreasonable assumptions about the single-sourcing of gas from British Columbia, as well as the unrealistically low leakage estimates for that source, the analysis confirms that NWIWs proposed facility would be enormously polluting.

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Emma Klein

9/21/20 @ 5:42 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Emerson Pirot

9/21/20 @ 5:42 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Carl Thor

9/21/20 @ 5:41 AM
Please deny the permits for building a massive gas-to-methanol plant at the Port of Kalama, WA. As a life-long recycler, I was chagrined to read recently of how the fossil fuel industry misled (read "lied to") the world in promoting the idea that pla...

Now, thanks to this decades long deception, the world is choking in plastic waste and our oceans are irretrievably polluted with plastics. It's the same old story of corporate industry fabricating "truth" to suit their own purposes and promote their own profits as long as possible, without regard to public and planetary health.

Why, then, should we be expected to believe what the fossil fuel industry says in promoting the Kalama methanol plant? Most of the exported methanol would be used to manufacture more plastics. And the facility would be responsible for generating large amounts of greenhouse gases (CO2 and leaked methane). These two facts alone are reason enough to prevent the project from going forward.

Thank you for your time.
No attachments

Comment From: Jane Walker

9/21/20 @ 5:40 AM
As we watch the effects of a changing climate impact us directly in the Pacific Northwest, as a State and an individual, we should all feel obligated to mitigate for this. And one of the ways is to not allow for production of a product like methanol...
No attachments

Comment From: Nasrin Mazuji

9/21/20 @ 5:35 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Christopher Tapfer

9/21/20 @ 5:26 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Margaret Colegrove

9/21/20 @ 5:19 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Elsie Lamb

9/21/20 @ 5:09 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

I'm not re-w...

This new Draft Supplemental Environmental Impact Statement represents some important improvements in evaluating the true climate impacts of this facility, including addressing the likelihood that methanol produced by this facility will be used as transportation fuel, despite deliberate efforts by NWIW to mislead your agency and the public otherwise. And while the SEIS has made some necessary adjustments in the methane leakage rates, the rates continue to be low estimates given the widespread underreporting of leaks. However, even with the unreasonable assumptions about the single-sourcing of gas from British Columbia, as well as the unrealistically low leakage estimates for that source, the analysis confirms that NWIWs proposed facility would be enormously polluting.

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Hilary Benson

9/21/20 @ 5:04 AM
Dear WA Department of Ecology,

As a person of faith, I believe we are called to care for both the well-being of communities and the environment.

Inherent in this moral imperative is investing in a livable future that is safe for all to thrive. As a mot...

Building the world's largest fracked gas-to-methanol plant in Washington does not align with my personal values of stewardship and justice, nor does it support our state's commitment to reducing climate pollution. Please reject Northwest Innovation Work's proposed methanol refinery in Kalama and deny its Shorelines Permit.

The second Supplemental Environmental Impact Statement for the Kalama methanol refinery clearly shows that this project is dirty, dangerous, and unwise. If built, our state will be locked into decades of additional climate pollution, even though we know it is past time to pursue a truly low-carbon future. Speculating that this project may displace other fossil fuels is not adequate justification for the known pollution that will harm our communities and climate.

Northwest Innovation Works has demonstrated that they are deceptive and will seek profit over people's wellbeing. They cannot be trusted to mitigate the impacts of this fracked gas refinery. The fact that the project has needed three reviews, with outspoken community opposition during each, shows that there is something wrong with it at its core. As Governor Inslee stated, we cannot support such fracked gas projects in good conscience.

You have a moral responsibility to protect public health and reduce our region's climate pollution. Please do what is right and deny this project. Thank you.

Sincerely,
Hilary Benson
7440 NE Coyote Farm Ln Bainbridge Island, WA 98110-3537
hilarybenson@gmail.com
No attachments

Comment From: Hilarie Ericson

9/21/20 @ 5:03 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: John Borland

9/21/20 @ 5:01 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Arden Green

9/21/20 @ 5:01 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Kathryn Jacobs

9/21/20 @ 4:59 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Elizabeth Verbeck

9/21/20 @ 4:59 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Uwe Dotzauer

9/21/20 @ 4:57 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Rhett Gambol

9/21/20 @ 4:57 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Marian Wineman

9/21/20 @ 4:56 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: David Hupp

9/21/20 @ 4:55 AM
I testify in opposition to the proposed Northwest Innovation Works (NWIW) Kalama Manufacturing and Marine Export Facility in any form. NWIW proposes a similar facility in Oregon and I oppose that as well.

I have lived in the Pacific Northwest for more...

The NWIW and its investors and allies represent substantial corporate wealth and possess the ability to hire skilled public relations. They will say anything to get this project approved and I don't believe anything they say. The corporate owners are not from the Pacific Northwest, do not understand our culture and environment, nor do they have our community interests at heart. The current SEIS (Draft Second Supplemental Environmental Impact Statement, Publication 20-06-011 dated September 2020) is so full of distracting analysis and turgid language as to be useless as a document for citizens. Its conclusions are highly flawed. In some respects the SEIS reads like a NWIW puff piece. In my work life I read many EISs and wrote a couple, so I know the game. I do not understand why the Washington Department of Ecology seems to be doing NWIW's work for them.

THE CARBON LOAD
The SEIS states the NWIW annual carbon emissions would be 4.6 million metric tons (mmt). The goal set in Washington law, updated in 2020, specifies "The state shall reduce ... overall emissions of greenhouse gases in the state to 1990 levels, or ninety million five hundred thousand metric tons" (http://lawfilesext.leg.wa.gov/biennium/2019-20/Pdf/Bills/Session Laws/House/2311-S2.SL.pdf?q=20200919150040).

Kalama's emissions are nearly 10% of the state's total emissions goal. The emissions also exceed the combined total emissions of 8 NW cities and the fracked gas used would be more than the combined total consumption of all the state's fracked-gas fueled power plants.

Washington is justly proud of their emissions goal and efforts to reach it, as expressed on both the governor's web site:
"The governor has: powered a new path to Washington's clean energy future by requesting and signing an unprecedented suite of clean energy legislation into law, ushering in aggressive timelines for decarbonizing Washington's economy and transforming the state's energy landscape."

and the Department of Ecology's:
"Washington is a national leader in cutting greenhouse gas emissions to prevent climate change. Gov. Jay Inslee and the Washington Legislature have adopted a variety of regulations, programs,�and initiatives designed to reduce greenhouse gas emissions. ... Ecology stands proud to protect, preserve, and enhance Washington's environment for current and future generations."

It appears that Kalama's emissions are as significant as any other pollution source in the state. Yet in examining the various versions of the SEIS I cannot even find a reference to the state's goals. Ecology must insist that the SEPA analysis comprehensively and honestly address the issue of how Kalama's total carbon emissions relate to the state's climate goals.

Whatever, NWIW promises vaguely to mitigate these emissions. There is no reason to trust NWIW's mitigation promises.

Your state's Shoreline Management Act, as shown on your website, says "The SMA establishes the concept of preferred shoreline uses. These uses are consistent with controlling pollution, preventing damage to the natural environment, or are unique to or dependent upon use of Washington's shorelines." Ecology must reject this boondoggle on the basis of unacceptable and unmitigatable carbon pollution.

BIGGER PLANS DRIVEN BY PROFIT
Because the Kalama proposal is but one of three, and because the fracked gas industry is desperate to export its surpluses, I suspect that NWIW has future plans that are as yet unstated in such documents as the SEIS, including plans for expanding Kalama to export liquified fracked gas (LNG). There is some evidence as well that the fracked gas volume required by Kalama will require a new transmission pipeline. In addition, the Trump Administration is allowing the shipment of LNG by rail. If such shipments occur, my state of Oregon is as threatened as the state of Washington.

Ecology must use its power to dig out all NWIW planning documents and emails showing future intent about anything beyond the refinery and a 3.1-mile feeder pipe, e.g., a new transmission pipeline and/or LNG export facility/expansion. We need the total picture of this corporation's intent to cut through the spin and promises.

EMISSION DISPLACEMENT
NWIW claims that part of its "mitigation" of carbon emissions is that their consumption of fracked gas will be more efficient than use of fracked gas elsewhere, and will displace the use of "dirtier" fuels in China (the SEIS says that the first "project objective" is "NWIW and the Port are pursuing the proposed project with the stated goal of reducing greenhouse gas (GHG) emissions globally by producing methanol from natural gas rather than coal"). These speculations about future energy decisions in foreign energy markets are so much hot air and Ecology must ignore them in their decision making.

JOBS AND TAX REVENUES
Ecology must ignore the jobs and local tax revenue claims made by NWIW. These are made-up numbers and not relevant to the department's responsibility to protect the state's air, water, and shorelines.

"PLASTICS MY BOY"
This advice may have had traction in 1967, but it advocates harm now. The idea that the Kalama facility exports are intended to help produce plastics in China is to propose a crime against nature. Plastics in all forms are polluting every system on earth. It is time to stop this madness and send NWIW packing.

David Hupp
Hood River OR
September 19,2020
davidhupp@charter.net
No attachments

Comment From: R G

9/21/20 @ 4:53 AM
I am extremely concerned about our air and our planet. We need to stop building and operating new facilities that contribute to increased greenhouse gases being emitted. I have a child and find it unacceptable that she is growing up to live in a worl...
No attachments

Comment From: Senator John Braun

9/21/20 @ 4:42 AM
Please see the attached letter from Senator John Braun
Attachments:

Comment From: Cheryn Zimmer

9/21/20 @ 4:35 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Daniel Roberts

9/21/20 @ 4:33 AM
Sometimes the alure of perfection eclipses the possible. The dream of a giant leap threatens an incremental step.
KMMEEF's Draft SSEIS demonstrates that its proposed methanol plant is an important incremental step.
The Draft SSEIS, using foreseeable va...
1. KMMEF's proposed methanol production will reduce net GHG comopared to using current alternatives to fill the demand.
2. Worldwide demand for methanol is projected to increase over the next several decades.
3. Whether methanol is used as fuel of olefin production, KMMEF's methanol production is better for the environment than existing sources.
As a health care professional, I have previously looked carefully at the health effects of methanol manufacturing, reviewing the medical literature of the past several decades. Because the toxic effects of methanol have been well documented and the physiology well understood, appropriate safeguards limiting exposure have long been in place. As long as these are maintained, the process is safe both for employees and for the community.
Furthermore, the science confirms that methanol poses much less risk to the environment than petroleum products because it is water miscible, disperses rapidly, and is much less toxic to life forms other than primates.
As an environmentally sensitive retired physician, it is apparent to me that KMMEF has made a compelling case that its planned facility will result in less global GHG emissions and deserves ecology's approval.

No attachments

Comment From: p perro

9/21/20 @ 4:32 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Mary Slowik Siciliano

9/21/20 @ 4:22 AM
Dear Members of the Department of Ecology,
Please deny the NW Innovation Works most recent permit application. We need clean air. We need safe air. The last few weeks here in Vancouver, Washington, have been proof of that. We have horrific evide...
Methane is a gas that also does not recognize state lines. Methane leaked from pipelines and fracked gas wells, and methane, converted into methanol in Kalama and then burned once more as methane in China (which NWIW now admits will be the case) is still methane. And the methanol produced more efficiently and with more care in the Kalama plant will not be color-coded so it will be recognized as "safe" methane. Methane is methane and is a more damaging greenhouse gas than carbon dioxide. There is no safe way it can be burned anywhere and in any amount in our current environment.
Please deny the Kalama permit once and for all.

No attachments

Comment From: David Cordero

9/21/20 @ 4:19 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sheryl Scarborough

9/21/20 @ 4:19 AM
Kalama is a small community. A blip on the radar when compared with other population dense areas. We are only three exits off the i5. A McMenimins recently installed along our gorgeous river front walkway has turned us into a desired 'let's get out o...
No attachments

Comment From: Virginia Voorhees

9/21/20 @ 4:16 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Aslaug Haraldsdottir

9/21/20 @ 4:10 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sally Hurst

9/21/20 @ 4:06 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Pete Weymiller

9/21/20 @ 4:05 AM
According to a consensus of global experts in science, economics, and national security climate change is the greatest threat to our health, natural resources, national security and future economy.

Extracting, transporting and burning fossil fuels not...

Fossil fuels already endanger our health, natural resources and economy. I have just breathed seven days of some of the most polluted air on earth that was caused by the forest fires generated by climate change.

Our precious fresh water resources are threatened by fracking for natural gas. And the risk of major explosions from natural gas has already been exposed.

With nearly 200 new residents to the NW each day we need to promote sustainable energy resources that we have already developed, ones that have made dangerous fossil fuels like natural gas obsolete.
No attachments

Comment From: Rachael Bratsch

9/21/20 @ 4:04 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Robin Moore

9/21/20 @ 4:03 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Elizabeth Gronert

9/21/20 @ 4:03 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Pete Weymiller

9/21/20 @ 4:01 AM
According to a consensus of global experts in science, economics, and national security climate change is the greatest threat to our health, natural resources, national security and future economy.

Extracting, transporting and burning fossil fuels not...

Fossil fuels already endanger our health, natural resources and economy. I have just breathed seven days of some of the most polluted air on earth that was caused by the forest fires generated by climate change.
Our precious fresh water resources are threatened by fracking for natural gas. And the risk of major explosions from natural gas has already been exposed.

With nearly 200 new residents to the NW each day we need to promote sustainable energy resources that we have already developed, ones that have made dangerous fossil fuels like natural gas obsolete.
No attachments

Comment From: Dorothy Mowry

9/21/20 @ 3:58 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Eliza Kronenberger

9/21/20 @ 3:57 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Gail Haubrich

9/21/20 @ 3:55 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Charlie Weir

9/21/20 @ 3:52 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Craig Heverly

9/21/20 @ 3:50 AM
It seems the argument being put out by this study goes something like this: "If we don't pour our gas on this fire, someone else will and they will pour more than us. So, isn't it better that we pour ours first?"

The point is, no one should be pouring...

With the planet blazing like Hell, what insanity to even toy with building this monstrosity! Please, think again. Put a stop to it once and for all.
No attachments

Comment From: Mona McNeil

9/21/20 @ 3:48 AM
I am totally opposed to the Kalama Methanol terminal.
I have lived in Vancouver for 32 years and am a retired Clinical Psychologist. My late Husband, Randy Kleinhesselink, was a Social Psychology professor at WSU and WSUV For 43years.
The estimates of...
I can tell you that even predicting future behavior of one individual is very problematic. Just think of people you know or family and community members who have behaved in very unexpected ways. When you add in more individuals, creating groups with different histories, different sensitivities, different belief systems, different systems of government... The complexity increases and predictions become more difficult.
Add in external factors, like natural disasters, wars, pandemics... Predictions become less accurate. The EIS is trying to make predictions for the next 40 years!
If it were a trivial matter, predict away and see what happens. But this is an earth-altering project and overly optimistic predictions lead to disastrous consequences.
Your LEAST harmful estimate is that this project will release a minimum of 4.6Million Tons of CO2 each Year for 40 years!
Forget what other hypothetical decisions by other countries might do over 40 years!
Another issue is that NWIW will lead to Chinese output of either plastic or fuel.
We need to keep moving toward Clean energy and good jobs in that pursuit
Even Fox News reported on 9/20/20 that an article in Science found "53 trillion tons of plastic will be in earth's waterways by 2030"!!! Let that sink in.
Mitigations according to the Fox News report include REDUCING production of plastic waste by 25-40%.
The Fox News article concluded that plastic pollution in our world's oceans could have a $2.5 Trillion impact, disrupting "almost all marine ecosystems".
For these, and so many other reasons, please put this project in its grave.
Thank You, Mona McNeil, Ph.D.

No attachments

Comment From: Nathan Fritz

9/21/20 @ 3:48 AM
Please do not let money motivate a decision to forward a project that will further contribute to the destruction of our beautiful state. The emissions will only contaminate our air, water & land! Please do not do this just to make more $$$$!
No attachments

Comment From: Kerstin Rogers

9/21/20 @ 3:47 AM
The creation of a Kalama methanol facility is an unacceptable action in our state during this time of climate change crisis. We are living in the midst of catastrophic wildfires and storms that are increasing in frequency and severity and dangerous c...
We should also stop contributing to the production of plastics that are poisoning our bodies with chemicals that mimic estrogen, causing diseases like breast cancer, and that end up in our oceans or in landfills for 1,000 years until they biodegrade. We must change course and use alternative fuels and products in the years to come. I demand that as a citizen of Washington State.

Sincerely,

Kerstin Rogers
No attachments

Comment From: Kurt Fox

9/21/20 @ 3:47 AM
I am submitting my opinion on The Second Supplemental EIS for Kalama Manufacturing and Export Facility. I am against this. We should not start any new fracking projects. They damage water quality, increase risk of earth quakes, and increase green ...
No attachments

Comment From: Angela Wood

9/21/20 @ 3:46 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Ann Lewis

9/21/20 @ 3:45 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Luan Pinson

9/21/20 @ 3:42 AM
The methanol produced by this project would be shipped overseas to be used/burned as fuel or to make plastics. Both of which we don't need more of polluting our environment.

The State of Washington is trying to move towards a clean energy economy and...

NWIW lied to local and state regulators and they claimed the millions of tons of methanol produced each year would not be combusted as fuel. They then told investors about the potential for the use of the methanol for fuel.

We should be moving away from fracked gas, not embracing it. This project would use more fracked gas than all of Washington's gas-fired power plants, combined.

We have been lied to and this is a dirty, dangerous climate changing pollution producing project.

No attachments

Comment From: Jackson Ogden

9/21/20 @ 3:40 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of the coronavirus pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades.

Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions.

Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this projectthat it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Mona McNeil

9/21/20 @ 3:39 AM
I am totally opposed to the Kalama Methanol terminal.
I have lived in Vancouver for 32 years and am a retired Clinical Psychologist. My late Husband, Randy Kleinhesselink, was a Social Psychology professor at WSU and WSUV For 43years.
The estimates of...
I can tell you that even predicting future behavior of one individual is very problematic. Just think of people you know or family and community members who have behaved in very unexpected ways. When you add in more individuals, creating groups with different histories, different sensitivities, different belief systems, different systems of government... The complexity increases and predictions become more difficult.
Add in external factors, like natural disasters, wars, pandemics... Predictions become less accurate. The EIS is trying to make predictions for the next 40 years!
If it were a trivial matter, predict away and see what happens. But this is an earth-altering project and overly optimistic predictions lead to disastrous consequences.
Your LEAST harmful estimate is that this project will release a minimum of 4.6Million Tons of CO2 each Year for 40 years!
Forget what other hypothetical decisions by other countries might do over 40 years!
Another issue is that NWIW will lead to Chinese output of either plastic or fuel.
We need to keep moving toward Clean energy and good jobs in that pursuit
Even Fox News reported on 9/20/20 that an article in Science found "53 trillion tons of plastic will be in earth's waterways by 2030"!!! Let that sink in.
Mitigations according to the Fox News report include REDUCING production of plastic waste by 25-40%.
The Fox News article concluded that plastic pollution in our world's oceans could have a $2.5 Trillion impact, disrupting "almost all marine ecosystems".
For these, and so many other reasons, please put this project in its grave.
Thank You, Mona McNeil, Ph.D.

No attachments

Comment From: Joleen Strunk

9/21/20 @ 3:39 AM
Please do not allow this plant to be built here in our quaint little city of Kalama. There are so many reasons why this is bad for the residents here. It will be a disgusting eye sore. I can't imagine the property values not decreasing due to this. P...
No attachments

Comment From: Keren Berry

9/21/20 @ 3:39 AM
Please do NOT allow this project to be constructed. The environmental impacts far outweigh the benefits.
No attachments

Comment From: SF Brown

9/21/20 @ 3:37 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Paul Schutt

9/21/20 @ 3:37 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Katharine Harkins

9/21/20 @ 3:37 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Keli Grace

9/21/20 @ 3:36 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: m'lou christ

9/21/20 @ 3:36 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

And more ana...

This new Draft Supplemental Environmental Impact Statement represents some important improvements in evaluating the true climate impacts of this facility, including addressing the likelihood that methanol produced by this facility will be used as transportation fuel, despite deliberate efforts by NWIW to mislead your agency and the public otherwise. And while the SEIS has made some necessary adjustments in the methane leakage rates, the rates continue to be low estimates given the widespread underreporting of leaks. However, even with the unreasonable assumptions about the single-sourcing of gas from British Columbia, as well as the unrealistically low leakage estimates for that source, the analysis confirms that NWIWs proposed facility would be enormously polluting.

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Annalisa Ochiltre

9/21/20 @ 3:33 AM
As a state and a nation we need to be investing in green energy, not something like this that will so substantially increase greenhouse gas emissions in washington state. I am deeply apposed to this project going forward.
No attachments

Comment From: Roni Patterson

9/21/20 @ 3:33 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Lynnette Chiotti

9/21/20 @ 3:29 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Eleanor Hungate

9/21/20 @ 3:28 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Carey Dietrich

9/21/20 @ 3:28 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Dani Schulman

9/21/20 @ 3:25 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Mckenna Morrigan

9/21/20 @ 3:23 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Janet Ceballos

9/21/20 @ 3:13 AM
Please stop the building of this methanol plant. The ecological impact in our state and the financial state of the local community is in danger. Not to diminish the emotional injury if the cemetery is impacted. Please stop the building of this plant....
No attachments

Comment From: Susan Towle

9/21/20 @ 3:11 AM
With our planet literally at grave risk, it is unconscionable to build this methanol plant. All the research and data points to the enormous ill effects this project will create if approved. Do not do this! Do the right thing!!
No attachments

Comment From: Christina Scheuer

9/21/20 @ 3:10 AM
The permit for the Kalama methanol plant should be denied. This project works directly against our climate goals. It will lead to increased pollution and greenhouse gas emissions, and it will have negative impacts on the Kalama community. We need to ...
No attachments

Comment From: d c

9/21/20 @ 3:09 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.

NO NO A 1000x NO
No attachments

Comment From: Nancy Horman

9/21/20 @ 3:06 AM
Dear WA Department of Ecology,

As a person of faith, I believe we are called to care for both the well-being of communities and the environment.

Inherent in this moral imperative is investing in a livable future that is safe for all to thrive.
I am surp...
I do feel for the people of Cowlitz County - loss of logging and other jobs. But why not try in find investments in solar and other conservation jobs? Washingtonians are creative people. Open up chances.
Please consider the futures of the children.
Thank you,
Nancy Horman
Seattle, Washington

Building the world's largest fracked gas-to-methanol plant in Washington does not align with my personal values of stewardship and justice, nor does it support our state's commitment to reducing climate pollution. Please reject Northwest Innovation Work's proposed methanol refinery in Kalama and deny its Shorelines Permit.

The second Supplemental Environmental Impact Statement for the Kalama methanol refinery clearly shows that this project is dirty, dangerous, and unwise. If built, our state will be locked into decades of additional climate pollution, even though we know it is past time to pursue a truly low-carbon future. Speculating that this project may displace other fossil fuels is not adequate justification for the known pollution that will harm our communities and climate.

Northwest Innovation Works has demonstrated that they are deceptive and will seek profit over people's wellbeing. They cannot be trusted to mitigate the impacts of this fracked gas refinery. The fact that the project has needed three reviews, with outspoken community opposition during each, shows that there is something wrong with it at its core. As Governor Inslee stated, we cannot support such fracked gas projects in good conscience.

You have a moral responsibility to protect public health and reduce our region's climate pollution. Please do what is right and deny this project. Thank you.

Sincerely,
Ms. Nancy Horman
7116 Greenwood Ave N Apt 401 Seattle, WA 98103-5065
nhorman@comcast.net
No attachments

Comment From: Virginia Van Zee

9/21/20 @ 3:03 AM
Dear WA Department of Ecology,

As a person of faith, I believe we are called to care for both the well-being of communities and the environment.

Inherent in this moral imperative is investing in a livable future that is safe for all to thrive.

Building ...

The second Supplemental Environmental Impact Statement for the Kalama methanol refinery clearly shows that this project is dirty, dangerous, and unwise. If built, our state will be locked into decades of additional climate pollution, even though we know it is past time to pursue a truly low-carbon future. Speculating that this project may displace other fossil fuels is not adequate justification for the known pollution that will harm our communities and climate.

Northwest Innovation Works has demonstrated that they are deceptive and will seek profit over people's wellbeing. They cannot be trusted to mitigate the impacts of this fracked gas refinery. The fact that the project has needed three reviews, with outspoken community opposition during each, shows that there is something wrong with it at its core. As Governor Inslee stated, we cannot support such fracked gas projects in good conscience.

You have a moral responsibility to protect public health and reduce our region's climate pollution. Please do what is right and deny this project. Thank you.

Sincerely,
Virginia Van Zee
6523 1st Ave NW Seattle, WA 98117-4826
virginia.vanzee@gmail.com
No attachments

Comment From: Patricia Baley

9/21/20 @ 2:57 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Terri Dundas

9/21/20 @ 2:55 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sarah Farbstein

9/21/20 @ 2:54 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Sandra Holt

9/21/20 @ 2:53 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
Take the food away from the sumo wrestlers that are in control.
No attachments

Comment From: Lynn Fitz-Hugh

9/21/20 @ 2:45 AM
Dear WA Department of Ecology,

As a person of faith, I believe we are called to care for both the well-being of communities and the environment.

Inherent in this moral imperative is investing in a livable future that is safe for all to thrive.

Building ...

The second Supplemental Environmental Impact Statement for the Kalama methanol refinery clearly shows that this project is dirty, dangerous, and unwise. If built, our state will be locked into decades of additional climate pollution, even though we know it is past time to pursue a truly low-carbon future. Speculating that this project may displace other fossil fuels is not adequate justification for the known pollution that will harm our communities and climate.

Northwest Innovation Works has demonstrated that they are deceptive and will seek profit over people's wellbeing. They cannot be trusted to mitigate the impacts of this fracked gas refinery. The fact that the project has needed three reviews, with outspoken community opposition during each, shows that there is something wrong with it at its core. As Governor Inslee stated, we cannot support such fracked gas projects in good conscience.

You have a moral responsibility to protect public health and reduce our region's climate pollution. Please do what is right and deny this project. Thank you.

Sincerely,
Lynn Fitz-Hugh
1716 11th Ave SE Olympia, WA 98501-2503
lynn@fitzhugh.org
No attachments

Comment From: John Waddington

9/21/20 @ 2:43 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Court Olson

9/21/20 @ 2:43 AM
Dear WA Department of Ecology,

As a person of faith, I believe we are called to care for both the well-being of communities and the environment.

The paragraphs after this one were drafted by Earth Ministries --a strong and trusted voice in the religiou...

Building the world's largest fracked gas-to-methanol plant in Washington does not align with my personal values of stewardship and justice, nor does it support our state's commitment to reducing climate pollution. Please reject Northwest Innovation Work's proposed methanol refinery in Kalama and deny its Shorelines Permit.

The second Supplemental Environmental Impact Statement for the Kalama methanol refinery clearly shows that this project is dirty, dangerous, and unwise. If built, our state will be locked into decades of additional climate pollution, even though we know it is past time to pursue a truly low-carbon future. Speculating that this project may displace other fossil fuels is not adequate justification for the known pollution that will harm our communities and climate.

Northwest Innovation Works has demonstrated that they are deceptive and will seek profit over people's wellbeing. They cannot be trusted to mitigate the impacts of this fracked gas refinery. The fact that the project has needed three reviews, with outspoken community opposition during each, shows that there is something wrong with it at its core. As Governor Inslee stated, we cannot support such fracked gas projects in good conscience.

You have a moral responsibility to protect public health and reduce our region's climate pollution. Please do what is right and deny this project. Thank you.

Sincerely,
Court Olson
15817 SE 26th St Bellevue, WA 98008-5445
court.olson@yahoo.com
No attachments

Comment From: Sally Jo Gilbert de Vargas

9/21/20 @ 2:40 AM
Dear WA Department of Ecology,

As a person of faith, I believe we are called to care for both the well-being of communities and the environment.

Inherent in this moral imperative is investing in a livable future that is safe for all to thrive. The worl...

Building the world's largest fracked gas-to-methanol plant in Washington does not align with my personal values of stewardship and justice, nor does it support our state's commitment to reducing climate pollution. Please reject Northwest Innovation Work's proposed methanol refinery in Kalama and deny its Shorelines Permit.

The second Supplemental Environmental Impact Statement for the Kalama methanol refinery clearly shows that this project is dirty, dangerous, and unwise. If built, our state will be locked into decades of additional climate pollution, even though we know it is past time to pursue a truly low-carbon future. Speculating that this project may displace other fossil fuels is not adequate justification for the known pollution that will harm our communities and climate.

Northwest Innovation Works has demonstrated that they are deceptive and will seek profit over people's wellbeing. They cannot be trusted to mitigate the impacts of this fracked gas refinery. The fact that the project has needed three reviews, with outspoken community opposition during each, shows that there is something wrong with it at its core. As Governor Inslee stated, we cannot support such fracked gas projects in good conscience.

You have a moral responsibility to protect public health and reduce our region's climate pollution. Please do what is right and deny this project. Thank you.

Sincerely,
Ms. Sally Jo Gilbert de Vargas
2645 NW 60th St Seattle, WA 98107-3258
sallyjogilbert@gmail.com
No attachments

Comment From: Sherril Gerell

9/21/20 @ 2:39 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Katherine Chesick

9/21/20 @ 2:39 AM
Dear WA Department of Ecology,

As a person of faith, I believe we are called to care for both the well-being of communities and the environment.

Inherent in this moral imperative is investing in a livable future that is safe for all to thrive. We have...

Building the world's largest fracked gas-to-methanol plant in Washington does not align with my personal values of stewardship and justice, nor does it support our state's commitment to reducing climate pollution. Please reject Northwest Innovation Work's proposed methanol refinery in Kalama and deny its Shorelines Permit.

The second Supplemental Environmental Impact Statement for the Kalama methanol refinery clearly shows that this project is dirty, dangerous, and unwise. If built, our state will be locked into decades of additional climate pollution, even though we know it is past time to pursue a truly low-carbon future. Speculating that this project may displace other fossil fuels is not adequate justification for the known pollution that will harm our communities and climate.

Northwest Innovation Works has demonstrated that they are deceptive and will seek profit over people's wellbeing. They cannot be trusted to mitigate the impacts of this fracked gas refinery. The fact that the project has needed three reviews, with outspoken community opposition during each, shows that there is something wrong with it at its core. As Governor Inslee stated, we cannot support such fracked gas projects in good conscience.

You have a moral responsibility to protect public health and reduce our region's climate pollution. Please do what is right and deny this project. Thank you.

Sincerely,
Katherine Chesick
1039 NE 127th St Seattle, WA 98125-4005
kchesick@earthlink.net
No attachments

Comment From: Gail Atkins

9/21/20 @ 2:38 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Kristina Fury

9/21/20 @ 2:35 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: susan Betourne

9/21/20 @ 2:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Felix Lee

9/21/20 @ 2:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Michelle McRae

9/21/20 @ 2:31 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Janette Favro

9/21/20 @ 2:23 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Rick Pietrusiak

9/21/20 @ 2:21 AM
I have read and agree with the statement below ... this project should not go forward. Thank you.
Thank you again for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works ...

This new Draft Supplemental Environmental Impact Statement represents some important improvements in evaluating the true climate impacts of this facility, including addressing the likelihood that methanol produced by this facility will be used as transportation fuel, despite deliberate efforts by NWIW to mislead your agency and the public otherwise. And while the SEIS has made some necessary adjustments in the methane leakage rates, the rates continue to be low estimates given the widespread underreporting of leaks. However, even with the unreasonable assumptions about the single-sourcing of gas from British Columbia, as well as the unrealistically low leakage estimates for that source, the analysis confirms that NWIWs proposed facility would be enormously polluting.

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments

Comment From: Portland Raging Grannies Anonymous

9/21/20 @ 2:17 AM
The Portland Raging Grannies join many other organizations in opposing the Kalama Facility. We are concerned about environmental impacts, both immediate and future. Please re-evaluate the project with a source to destination view.
Attachments:

Comment From: Danielle Jokela

9/21/20 @ 2:15 AM
Comments regarding the proposed methanol plant in Kalama:

The proposed methanol plant in Kalama would be an ecological disaster for our entire planet. It would cause millions of tons of greenhouse gas pollution, use millions of gallons of water from a...

As Americans, we need to be looking forward to the future. Fossil fuels are the energy of the past, they will not continue to sustain our nation or our planet. The rest of the world has begun to awaken to the realities of climate change. China, India, the EU, are all realizing the economic disaster, not to mention the human toll that climate change will cause. Those markets may look flush now, but they are all moving towards a truly clean energy future. China, for example, has enacted some of the most stringent emissions standards in the world, and they continue to tighten those standards each year. 50% of all new construction in China must meet a strict and well defined "green standard", and they have developed policies that incentivize local municipalities adoption of greater use of renewable energy sources.

Building the world's largest methanol plant on the shores of the Columbia River would be continuing to deny and ignore the real impacts of global climate change. It endangers the health and safety of millions of people who live, work and play in this rich watershed. It claims to create jobs, but those jobs are not the kind of jobs that will sustain the community in Kalama, or in Washington long term as the world is moving away from use of fossil fuels making the need for such a plant obsolete. The total ecological impact of such a project is enormous: damage to land and ground water caused by fracking, degradation of air quality caused by emissions from fracked gas and the process of turning that gas into other products, vast amounts of carbon dumped into our atmosphere driving global temperatures to increase, plastics that survive on this planet centuries longer than the humans who use them.
No attachments

Comment From: Marsha Barton

9/21/20 @ 2:12 AM
Thank you for your work to protect Washingtons environment and acknowledgement that previous environmental analysis of Northwest Innovation Works (NWIW) Methanol refinery proposal in Kalama, Washington have been inaccurate and inadequate.

This new Dra...

Despite these marginal improvements, the evaluation of potential mitigation and displacement contained in this analysis is misleading and concerning in its reliance on speculative and unenforceable assumptions. One can simply look to the impacts of this pandemic to see evidence of incredible uncertainty and volatility in energy market dynamics. It is dangerous to presume this analysis can accurately predict global fuel markets, technology developments, consumer behavior, or regulations for the coming four decades. Furthermore, the SEIS provides too little detail on the actual mitigation that would be accomplished within the voluntary mitigation framework, nor does this mitigation address the full impacts of NWIWs emissions that will occur overseas. The mitigation framework is too vague for Ecology to conclude that this projects impacts will be mitigated, and the urgency of climate change demands that mitigation should be the last option (after all other impacts are reduced) in order to address unavoidable impacts, not simply to maintain the status quo as we continue to build out the fossil fuel industry.

Even with all of its flaws, this analysis confirms that NWIWs proposed facility would become one of the greatest sources of climate pollution in Washington. It is simply unacceptable for Washington to build an unequivocally and enormously polluting facility based on speculative analysis and a faint hope of theoretical emission reductions. Ecology should dismiss the speculative basis that this project could displace even more polluting facilities, and instead should base its permitting decision on what is reasonably foreseeable and indeed, assured, about this project--that it would cause millions of tons of greenhouse gas pollution each year, for 40 years, and is profoundly inconsistent with achieving Washingtons climate goals.

The evidence in this draft SEIS demonstrates that Washington should deny NWIWs proposal to build and operate this dangerous methanol refinery in Kalama. We cannot keep building fossil fuel export infrastructure and expect to address the dangers of climate change.

Please keep our communities safe and keep Washington on track to meet our goals for reducing climate pollution.
No attachments