Formal Draft of the Industrial Stormwater General Permit

33 Results

Sort:

Comment From: Washington Department of Healt...

7/29/19 @ 5:00 PM
No attachments

Comment From: Washington Public Ports Associ...

7/11/19 @ 5:00 PM
No attachments

Comment From: Port of Grays Harbor

6/28/19 @ 5:00 PM
No attachments

Comment From: Association of Washington Busi... (Peter Godlewski)

6/28/19 @ 11:12 AM
Please see attached.
Attachments:

Comment From: Manufacturing Industrial Counc... (Dave Gering)

6/28/19 @ 10:05 AM
Please see June 28 letter from Manufacturing Industrial Council of Seattle.
Attachments:

Comment From: Windward Environmental (Aaron Edgington)

6/28/19 @ 8:38 AM
Attachments:

Comment From: The Northwest Seaport Alliance (Deanna Seaman)

6/28/19 @ 7:27 AM
Attachments:

Comment From: Andrew Cratsenberg

6/28/19 @ 6:49 AM
Attachments:

Comment From: BNSF Railway (Ryan Hibbs)

6/28/19 @ 6:47 AM
Formal comments submitted by BNSF Railway attached.
Attachments:

Comment From: Melvin Oleson

6/28/19 @ 6:15 AM
Thank you for the opportunity to comment on the most recent version (in draft) of the Washington State General Stormwater permit for industrial dischargers. My comments below are based on substantial experience in the development and implementation ...↓
Attachments:

Comment From: The Boeing Company (Steve Shestag)

6/28/19 @ 5:58 AM
Attachments:

Comment From: Boise Cascade Wood Products, L... (Eric Steffensen)

6/28/19 @ 4:47 AM
S3.B Operational source control bmp's: "Storm proof" lids will be required for dumpsters. Storm proof (worst case) could be interpreted to mean one solid lid without a seam down the middle to prevent any and all water from dripping inside and the li...↓
No attachments

Comment From: Port of Port Angeles (Jesse Waknitz)

6/28/19 @ 3:47 AM
Attachments:

Comment From: Bill Lider

6/27/19 @ 5:00 PM
No attachments

Comment From: Columbia Riverkeeper (Lauren Goldberg)

6/27/19 @ 9:20 AM
Attachments:

Comment From: Port of Seattle-Maritime (Jane Dewell)

6/27/19 @ 8:29 AM
Attachments:

Comment From: Ross Dunning

6/27/19 @ 8:08 AM
Attachments:

Comment From: Anonymous Anonymous

6/27/19 @ 2:23 AM
Please consider the following for further clarification and consideration: NAICS Codes NAICS codes also contain index entries that further describe the code. These index entries can lead to expansion or elaboration of the scope of applicable indu...↓
No attachments

Comment From: Center for Biological Diversit... (Sophia Ressler)

6/26/19 @ 2:46 AM
Attachments:

Comment From: Port of Vancouver (Phillip Martello)

6/26/19 @ 1:57 AM
Attachments:

Comment From: King County (Marilyn Guthrie)

6/25/19 @ 8:21 AM
Please find the attached comments from King County. The 2 files attached are the same comments. They have been provided in excel and pdf format to easy of use. For questions, comments, concern, etc., please contact Marilyn Guthrie mguthrie@kingc...↓
Attachments:

Comment From: Nisqually Environmental (John Allen)

6/24/19 @ 10:10 AM
Attachments:

Comment From: Northwest Indian Fisheries Com... (Alice Johnstone)

6/21/19 @ 9:55 AM
Good afternoon, Attached, please find a letter to Washington Department of Ecology Director Maia Bellon, from NWIFC Executive Director Justin Parker regarding Industrial Stormwater General Permit Reissuance - NWIFC Comments. If you have any que...↓
Attachments:

Comment From: Jerry Schamel

6/21/19 @ 7:57 AM
1. Scrap the SIC or NAICS codes from the start of the permit. While helpful to narrow down who is required to have a permit, the codes do not directly tie to "industrial activity". For example, log yards do not have a NAICS or SIC code. They were imp...↓
No attachments

Comment From: Gerry O'Keefe

6/19/19 @ 5:00 PM
No attachments

Comment From: Mel Oleson

6/19/19 @ 5:00 PM
No attachments

Comment From: Brian Derdowski

6/17/19 @ 5:00 PM
No attachments

Comment From: Dave Gering

6/17/19 @ 5:00 PM
No attachments

Comment From: Ecology (Joyce Mercuri)

6/17/19 @ 8:02 AM
This comment is for Section S6, Discharge to Impaired Waters. In S6.C.2., footnote #6, the Oakland Bay and Shelton Harbor sediment site (Cleanup Site ID 13007) should be included in the list of Puget Sound Sediment Cleanup Sites. The Shelton Harbor...↓
No attachments

Comment From: U.S. EPA (Karen Burgess)

6/12/19 @ 8:48 AM
The EPA suggests that the term "significant process change" be emphasized (bold-italic text) in S.2.B (first use in document) in addition to, or instead of, in S.4.B.8 to highlight that the permit includes a specific definition for this term.
No attachments

Comment From: Mel Oleson

6/05/19 @ 5:00 PM
No attachments

Comment From: Jim Bjorkman

6/05/19 @ 2:57 AM
It would nice if there was a simple place to find the changes being made. It would nice if the sections numbers from the old permit were not relabeled. Now we have to change every section in our plans based on new labels.
No attachments

Comment From: Judy Johanson

5/28/19 @ 5:00 PM
No attachments