I submitted comments on the 2018 draft 303(d) list of impaired waters to Ecology on June 4, 2021. I am attaching them here as they are also relevant to the proposed Nutrient General Permit.
Attachments:

Comment From: Claudia Balducci

8/16/21 @ 9:19 PM
Attachments:

Comment From: King County Councilmember (Kathy Lambert)

8/16/21 @ 8:07 PM
Please see the attached comment letter from King County Councilmember Kathy Lambert. Thank you.
Attachments:

Comment From: City of Langley (Randi Perry)

8/16/21 @ 7:26 PM
Attachments:

Comment From: Gordon Holtgrieve

8/16/21 @ 7:21 PM
Please see attached file.
Attachments:

Comment From: Puget Soundkeeper Alliance (Blair Englebrecht)

8/16/21 @ 6:40 PM
Attachments:

Comment From: Suquamish Tribe (A OSullivan)

8/16/21 @ 6:37 PM
Attachments:

Comment From: Skyway Water and Sewer Dsitric... (Cynthia Lamothe)

8/16/21 @ 6:11 PM
See attached letter from Skyway Water and Sewer District dated August 16, 2021, Subject: Draft Puget Sound Nutrient General Permit (PSNGP)
Attachments:

Comment From: Washington Water Trust (William Stelle)

8/16/21 @ 5:38 PM
Attachments:

Comment From: Lake Stevens Sewer District (Mariah Low)

8/16/21 @ 5:21 PM
Attachments:

Comment From: City of Tacoma, Environmental ... (Mike Slevin)

8/16/21 @ 5:15 PM
Attached are the City of Tacoma, Environmental Services comments.
Attachments:

Comment From: City of Sammamish (Audrie Starsy)

8/16/21 @ 5:03 PM
The City of Sammamish has submitted a letter for public comment (attached.)
Attachments:

Comment From: Erica Marbet

8/16/21 @ 4:47 PM
Dear Ms. Ott,
Please see attached letter from the Squaxin Island Tribe, along with our March 15th letter as reference.
Sincerely,
Erica Marbet
Attachments:

Comment From: Phyllis Farrell

8/16/21 @ 3:59 PM
Now is the time to protect Puget Sound from sewage pollution. The permit should protect and enhance Puget Sound water quality for marine life. The permit should require stringent nutrient reductions with established deadlines within 5 years, if not s...↓
No attachments

Comment From: City of Maple Valley (Tawni Dalziel)

8/16/21 @ 3:35 PM
Please accept the attached joint comment letter from the City of Maple Valley, City of Covington, and Soos Creek Water and Sewer District.
Attachments:

Comment From: EnvWA, ZWW, NDA, OEC, CHB, Sea... (Mindy Roberts)

8/16/21 @ 3:14 PM
Please see the attached letter on behalf of Environment Washington, Zero Waste Washington, RE Sources, Surfrider Foundation, SiteandWater.org, Nisqually Delta Association, Olympic Environmental Council, Washington Environmental Council, Washington Co...↓
Attachments:

Comment From: LINCOLN LOEHR

8/16/21 @ 3:05 PM
I had commented before about page 15 in the SEPA checklist which asserted that many parts of Puget Sound and the Salish Sea have DO levels that fall below the concentrations needed for marine life to thrive. Part of my response noted that most of Pu...↓
Attachments:

Comment From: Washington Environmental Counc... (Mindy Roberts)

8/16/21 @ 3:04 PM
Please see attached letter.
Attachments:

Comment From: City of Bremerton (Tom Knuckey)

8/16/21 @ 3:03 PM
The City of Bremerton's comments on the Draft NGP are uploaded
Attachments:

Comment From: Washington Environmental Counc...

8/16/21 @ 2:52 PM
Attachments:

Comment From: John Corso

8/16/21 @ 2:40 PM
August 16th, 2021

John Geoffrey Corso
701 N J St
Tacoma, WA 98403

Department of Ecology
ATTN: Eleanor Ott
P. O. Box 47696
Olympia, WA 98504-7696

Dear Eleanor Ott,

I support the draft PSNGP. The draft permit is a good first-step towards better understanding ...↓

Please consider modifying this draft PSNGP to require a "trust but verify" approach to measuring and reporting WWTP nutrient discharges. For example, consider requiring WWTPs to collect large samples of effluent on a regular schedule and at agreed upon location(s), using a portion of the sample to measure and report nutrients before sending the remainder of their sample to a central lab where third parties are able to obtain samples of effluent. Third parties might include environmental groups who want to check the reliability and validity of the WWTP data, colleges who want to train students to handle effluent and measure nutrients, and universities and industries interested in developing technologies for extracting nutrients from effluent or neutralizing them in the effluent. Further, all parties may be interested in measuring the full-spectrum of chemicals in effluent to identify unique chemical signatures for each WWTP's effluent based on the presence, absence and relative quantity of each chemical routinely found in their effluent. Taking water samples from dead zones and conducting a spectrochemical analysis may help investigators, like the Washington State Department of Fish and Wildlife, identify the WWTP(s) responsible for discharging more nutrient(s) into the estuary than the ecosystem can process in a healthy way. Eventually, I suspect Ecology will learn to allow some WWTPs to discharge more nutrients into the estuary than others depending on local tides, currents, winds, proximity to other WWTPs, and other variables while requiring other WWTPs to work harder to reduce the nutrients in their effluent to prevent entropification in the estuary.

Sincerely,


John G. Corso
No attachments

Comment From: Kitsap County Sewer Utility (Chris Sheridan)

8/16/21 @ 2:30 PM
Attachments:

Comment From: Northwest Environmental Advoca... (Nina Bell)

8/16/21 @ 2:27 PM
See letter attached.
Attachments:

Comment From: LINCOLN LOEHR

8/16/21 @ 2:22 PM
Please replace the comments I submitted earlier today with the attached comments. The difference is in the right hand column. I had prepared the comments for the City of Everett to consider submitting. They submitted other comments, so these comme...↓
Attachments:

Comment From: Surfrider Foundation, Washingt...

8/16/21 @ 2:07 PM
Attachments:

Comment From: LINCOLN LOEHR

8/16/21 @ 1:53 PM
Attachments:

Comment From: Jeanne Kohl-Welles

8/16/21 @ 1:43 PM
Please see the attached letter regarding the Puget Sound Nutrient General Permit. Thank you.
Attachments:

Comment From: WA Department of Fish & Wildli... (Kelly Susewind)

8/16/21 @ 1:42 PM
Please see the attached letter sent on behalf of Washington Department of Fish and Wildlife.
Attachments:

Comment From: City of Renton (Armondo Pavone)

8/16/21 @ 1:29 PM
Attachments:

Comment From: King County Department of Natu... (Rebecca Singer)

8/16/21 @ 1:17 PM
King County Department of Natural Resources and Parks is submitting comment for the Draft Puget Sound Nutrient General Permit. Thank you.
Attachments:

Comment From: Cross Valley Water District (Mike Johnson)

8/16/21 @ 1:03 PM
Attachments:

Comment From: LOTT Clean Water Alliance (Lisa Dennis-Perez)

8/16/21 @ 12:52 PM
Please see the attached letter for LOTT's comments on the nutrient general permit. Thank you for the opportunity to comment.
Attachments:

Comment From: Woodinville Water District (Patrick Sorensen)

8/16/21 @ 12:48 PM
Attachments:

Comment From: Earthjustice (Morgan Hentrup)

8/16/21 @ 12:13 PM
Attachments:

Comment From: Northwest Indian Fisheries Com... (Justin Parker)

8/16/21 @ 12:11 PM
Good afternoon,

Attached, please find a letter and attachment from NWIFC Executive Director Justin Parker to Eleanor Ott, Water Quality Permitting Specialist, Washington State Department of Ecology regarding NWIFC Principles to Support Nutrient Genera...↓

If you have any questions, please contact Mike Martinez, NWIFC Habitat Policy Analyst at mmartinez@nwifc.org.

Thank you.
Attachments:

Comment From: Carmichael Clark, P.S. (Jasmine Barnett)

8/16/21 @ 11:33 AM
Submission from Carmichael Clark, P.S. on behalf of Birch Bay Water & Sewer District.
Attachments:

Comment From: Carmichael Clark, P.S. (Robert Carmichael)

8/16/21 @ 10:59 AM
Attachments:

Comment From: Town of Coupeville (Molly Hughes)

8/16/21 @ 10:29 AM
See comment letter upload.
Attachments:

Comment From: Puget Sound Naval Shipyard & I...

8/16/21 @ 10:26 AM
See attached file.
Attachments:

Comment From: City of Bellevue (Cheryl Paston)

8/16/21 @ 10:15 AM
Attachments:

Comment From: City of Port Angeles, WA (Thomas Hunter)

8/16/21 @ 10:03 AM
Attachments:

Comment From: Joseph Grogan

8/16/21 @ 9:46 AM
August 3, 2021

Eleanor Ott
PSNGP Permit Writer
Department of Ecology Water Quality Program
PO Box 47600 Olympia, WA 98504-7600

RE: Comments on Draft Puget Sound Nutrient General Permit
Dear Ms. Ott: Thank you for the opportunity to comment on the draft Pug...↓
The nutrient loading of small wastewater treatment facilities is a minor issue compared to the natural sources of nutrient inflow to Puget Sound. Addressing large treatment plants and natural sources of nitrogen in surface water runoff would be a more cost effective and efficient solution. The fact sheet states that the 30 "small" facilities collectively contribute less than 1% of the "cumulative domestic point source TIN load into Puget Sound. Although it does not state how minuscule the loading is in the overall picture.
Despite the Utilities Caucus concerns whether nutrient controls are an appropriate and cost-effective answer, Ecology is proposing a "General" Permit and requiring extensive planning to be completed by each wastewater treatment plant without consideration of size. Ecology is also requiring wastewater treatment plants to double their planning efforts in this draft by requiring submittals of multiple plans to meet two widely different scenarios at a considerable added expense. No explanation is given as to why a "small" facility is burdened with developing these studies other than on Page 48 it states: "Completion of a planning exercise during this first permit term is necessary to minimize the time required to ultimately achieve final numeric effluent limits once developed." As facility operators have pointed out repeatedly, going through planning exercises without knowing the "final numeric effluent limits" for which they should aim is a costly duplication of efforts. A goal of 3 mg/L (for instance) requires very different technology and site redevelopment than a target of 8 mg/L.

Page 61 notes that an economic analysis of the impact of the Draft Permit was not prepared because it was not required by State Law. Despite that fact, Ecology is very aware the permit requirements will have a significant economic impact on citizens and businesses. One would think that the State Department would want to understand and discuss the magnitude of the impacts on citizens and businesses. Yet Ecology is requiring each small facility complete an economic evaluation and environmental justice review. This should instead be done with a regional study. It would be much more cost effective, and develop more useful information.



The draft requires "small" facilities, regardless of size, to develop AKART studies by 2025. Given their small sizes, this would be considerable expense for little positive effect.
Page 23, Section 2�Requires Permittees to "document all adaptive management following initial implementation..." As the utilities caucus have repeatedly told Ecology, most if not all plants already do "adaptive management"�they implement a process, monitor the results, and change the process as needed. "all" would be a significant administrative burden, and would open agencies to lawsuits because they did not document some action.
Page 24, Item 3.b- "small" agencies do not have the resources to study ways to reduce TIN from multi-family and commercial buildings. This is a regional issue, not one for individual facilities.
On Page 46 it states: "Ecology intends for the implemented optimization strategies to help each Permittee stay below their facility specific action level. This prevents additional nitrogen loading into Puget Sound during the period while Ecology completes modeling necessary to determine numeric WQBELs." As facilities must also plan for growth and changing circumstances to keep below their action levels, a building moratorium will also be necessary during this time.

Sincerely,

Joseph Grogan


Joseph Grogan
Town of Coupeville
Utilities Superintendent
(360)678-4461 ext.113
Utilities1@townofcoupeville.org
No attachments

Comment From: City of Kirkland (Penny Sweet)

8/16/21 @ 7:37 AM
Attachments:

Comment From: Patrick Kongslie

8/16/21 @ 7:24 AM
Attachments:

Comment From: William Stelle (Michael Connor)

8/15/21 @ 8:49 PM
Attachments:

Comment From: Sierra Club Washington State C... (George Watland)

8/15/21 @ 4:23 PM
The Sierra Club, representing over 130,000 members and supporters across the State of Washington, welcomes this opportunity to submit comments regarding the Draft Puget Sound Nutrient General Permit (attached).
Attachments:

Comment From: Tara Galuska

8/14/21 @ 11:25 AM
Please see attached letter
Attachments:

Comment From: City of Edmonds (Pamela Randolph)

8/14/21 @ 6:44 AM
August 13, 2021
The City of Edmonds (Edmonds) respectfully submits the following comments on the Department of Ecology, Draft Puget Sound Nutrient General Permit (PSNGP). The comments have been developed by Edmonds staff working in collaboration with ...↓

If you have any questions regarding these comments, please do not hesitate to contact Pamela Randolph, Wastewater Treatment Plant Manager, at 425.771.0237, or by e-mail at pamela.randolph@edmondswa.gov.

1. General. The monitoring, analysis and reporting requirements of the Draft PSNGP will place a substantial economic burden on dischargers, necessitating the addition of staff, budgeting of outside laboratory services, budgeting of outside consulting services, and costs for optimization implementation. These new expenditures have not been captured within existing budgets and rate structures, and dischargers should be given a one-year period to obtain the required outside services, funding and utility rate adjustments before the new requirements for PSNGP reports, submittals, and reporting take effect.

2. Tables 1 and 2, Summary of Permit Report Submittals and Required On-Site Documentation. There is a large number of Permit Report Submittals and On-Site Documentation(s) required by the PSNGP; however, not all are listed in Tables 1 and 2. For example, the Annual Report does not appear in Table 1. It would be of great assistance if all of the PSNGP submittal and documentation requirements are concisely summarized in Tables 1 and 2 to help POTWs navigate through and better comply with these requirements.

3. S2.D Modification of Permit Coverage, Significant Process Changes. Please clarify/elaborate with examples of a significant process change due to a corrective action. Presumably this would only apply to plant or process modifications that go beyond the scope of plant optimization which are mostly operational modifications.

4. S4.B, Table 5 Dominant WWTPS, TIN Action Levels. Please elaborate on the basis of the TIN action levels in Table 5. The values are changed from the AL0 levels in the preliminary draft permit for many facilities, e.g. reduced significantly for King County plants and moderately increased for Edmonds. For Edmonds, the action level increased from the AL0 of 409,000 lb/yr in the preliminary draft permit to 419,000 lb/yr. The current Edmonds Action Level is still considerably lower than the 478,000 lb/yr that would be obtained if a sampling frequency of 1 sample per month is used in the Bootstrap method to better reflect the historical dataset, as detailed in our comments submitted to Ecology on 3/15/2021 on the preliminary draft permit, under comment No. 6, Nutrient action level calculations. Please explain the basis of the current Edmonds Action Level value and why the proposed adjustment based on 1 sample per month does not appear to have been taken into consideration. Please also confirm that the No. 2 and No. 3 comments in Edmonds' 3/15/2021 comments on the data gaps and outliers have been addressed.

5. S4.C Nitrogen Optimization Plan, General. The Nitrogen Optimization Plan and prioritized optimization strategies do not appear to be separate, up-front Ecology submittals. Rather, they are submitted through the Annual Reports. Please confirm.

6. S4.C Nitrogen Optimization Plan, General. Is development of prioritized list of optimization strategies to be completed in first year of permit?

7. S4.C Nitrogen Optimization Plan, General. How is: "By May 1, 2022, select at least one optimization strategy for implementation" determined and communicated to Ecology? It is said that "The Permittee may exclude any optimization strategy considered but found to exceed a reasonable implementation cost or timeframe that exceeds one year. Documentation must include an explanation of the rationale and financial criteria used in the exclusion determination." Is the selection solely at the City's discretion based on what the City deems as a reasonable implementation cost? This selection does not appear to be a separate, up-front Ecology submittal, but submitted through the Annual Reports. Please confirm.

8. S4.C.3 Influent Nitrogen Reduction Measures/Source Control. Influent nitrogen reduction measures/source controls are best performed as part of the comprehensive Nutrient Reduction Evaluation as opposed to the more tactical Annual Reports, to provide the necessary time for the required evaluations and facilitate a holistic assessment of reduction opportunities. Can flexibility be allowed for permittee to develop a program to reduce influent TIN loads as part of either the optimization plan or the Nutrient Reduction Evaluation? Also, please elaborate and provide guidance on how to "Identify strategies for reducing TIN from new multi-family/dense residential developments and commercial buildings." Will this require monitoring of flows/loads and installation of equipment such as grease traps?

9. S4.D.1.a Action Level Exceedance Corrective Actions. The compliance with the PSNGP is assessed by annual mass loadings in accordance with the Action Level trigger values. A reasonable approach to economically achieve the compliance is to optimize the TIN removal seasonally, i.e. achieving higher TIN removals in summer and lower TIN removals in winter. Corrective actions under S4.D.1.a would require a retrospective assessment of exceedances on an individual day basis. The assessment of exceedance of the equivalent daily TIN action level (=annual TIN Action Level/365 days) would be incomplete or inaccurate unless a plant quantified TIN daily, year-round, and targeted the same level of TIN removal without seasonal variations. The goal of the PSNGP is to reduce annual mass loadings of TIN to the Sound, and the assessment of daily exceedance values does not contribute to meeting that objective.

10. S4.E, Nutrient Reduction Evaluation. AKART analyses have not been commonly performed on/for municipal wastewater treatment plants, and in particular for nitrogen removal. Since so many AKART analyses will be performed under the PSNGP, it would be beneficial and efficient for Ecology to provide additional guidance to help frame the AKART analysis and financial test considerations, including a proposed list of treatment technologies that are required to be analyzed, at a minimum.

11. S4.E, Nutrient Reduction Evaluation. The AKART analysis narrative in the Nutrient Reduction Evaluation, Section S4.E appears very focused on treatment plant-based grey infrastructure approaches. Can non-point source reductions and WAC 173-201A-450-offsets/trading also be considered in the AKART analysis?

12. S4.E.5.c, Economic Evaluation for Nutrient Reduction Evaluation. The permittee is required to "Develop capital, operation and maintenance costs and 20-year net present value using the real discount rate in the most current Appendix C to Office of Management and Budget Circular No. A-94 for each technology alternative evaluated." There are a variety of AKART processes, some of which will very likely be considered but found inapplicable/inappropriate due to site-specific conditions and thus excluded from more detailed evaluation. Economic analysis for these screened-out alternatives will be costly and unnecessary, and a narrowing process should be allowed to provide an efficient assessment framework. Please confirm that economic evaluations are not required for alternatives that are considered but screened out as inapplicable/inappropriate under a narrowing process.

13. S4.E.5.d, Environmental Justice (EJ) Review. Edmonds is relatively unique in that it receives wastewater from not only the City, but also from portions of adjacent communities of Mountlake Terrace, Ronald Wastewater District District/City of Shoreline, Olympic View Water and Sewer District, and the City of Lynnwood. Mountlake Terrace in-turn provides wastewater service to a portion of Brier. In addition, the City receives varying flows from a portion of the King County wastewater system and exports a portion of its flow to King County. The City of Edmonds sends a significant amount of flow to the Lynnwood wastewater plant. Edmonds residents are required to pay their proportional share of all O&M and Capital treatment plant upgrades. City of Edmonds residents would potentially be required to pay for upgrades of two treatment plants that are uniquely situated and will be significantly expensive to upgrade. The Edmonds service area is so diverse; demographics so widely dispersed across varying government jurisdictions; and source flows so variable given the King County flow transfer, that we see no way to develop an accurate and defensible EJ review. What may be affordable for one of the component service area communities may not be affordable for another.

14. S6 Monitoring Schedules and Sampling Requirements. The effective date for start of PSNGP influent/effluent monitoring should be identified (e.g., within "X" calendar days of the effective date of the PSNGP permit coverage). A minimum 60-day allowance should be made for municipalities to put into place sampling and analysis plans and obtain any necessary outside services.

15. S9,A. Currently DMRs for individual NPDES permit are submitted by 15th of the following month. Please confirm that 28th day of following month will be the deadline for the DMR submitting for purposes of meeting both the individual and general permits, and one submission per month is needed for meeting both permits.

16. S4.D.1.d. "If a Permittee exceeds an action level two years in a row, or for a third year during the permit term, the Permittee must begin to reduce nitrogen loads by implementing the proposed approach submitted per S4.D.1.c following Ecology's written approval". No specific deadline is specified for the implementation of the proposed approach. The proposed approach most likely would involve modifications to the operations and may take time to optimize to achieve the desired TIN reduction. Is the permittee not required to achieve the TIN reduction by a certain deadline, provided that they start implementing the approach?

17. G1 Discharge Violations. "All discharges and activities authorized by this general permit must be consistent with the terms and conditions of this general permit. Any discharge of any pollutant at a level in excess of that identified and authorized by the general permit is a violation of the terms and conditions of this permit." Is the exceedance of the TIN Action Level a violation, or something that merely triggers corrective actions under S4.D, and is therefore not considered as a violation provided corrective actions are taken?
Attachments:

Comment From: City of Everett (John Rabenow)

8/13/21 @ 3:07 PM
Attached are the City of Everett's comments on the Puget Sound Nutrient General Permit.
Attachments:

Comment From: Pierce County Planning and Pub... (Patrick Kongslie)

8/13/21 @ 3:04 PM
Attachments:

Comment From: Silver Lake Water and Sewer Di... (Curt Brees)

8/13/21 @ 2:03 PM
Please see attached comments from the Silver Lake Water and Sewer District.
Attachments:

Comment From: City of Anacortes (Rebecca Fox)

8/13/21 @ 10:31 AM
Attachments:

Comment From: Alderwood Water & Wastewater D... (Dick McKinley)

8/13/21 @ 9:53 AM
Please view comments from Alderwood Water & Wastewater District included in attached document.
Attachments:

Comment From: USEPA Region 10 (Jennifer Wu)

8/13/21 @ 9:40 AM
EPA Region 10 appreciates Ecology's efforts to share information and receive feedback during permit development, including through discussions in the Puget Sound Nutrient General Permit Advisory Committee and the Puget Sound Nutrient Forum. Below are...↓

1. General Comment. EPA strongly supports State efforts to reduce excess nutrients and protect and restore their waters. The development and issuance of a Puget Sound Nutrient General Permit is an important first step for wastewater treatment facilities to not increase nutrient loading in the Puget Sound in the short term and to evaluate technologies and operations for reducing nutrient loading in the near future. Assigning different permit conditions to "dominant" and "smallest" loaders are a reasonable way to distinguish requirements for large and small nutrient dischargers.

The proposed permit also includes non-numeric limits citing 40 CFR 122.44(k)(3)), which is reasonable given the reasons described in the Fact Sheet. EPA believes, however, that by the second permit's reissuance, the permit must include numeric nutrient limits since the Salish Sea Model scenario runs will be complete, and there will be sufficient data from wastewater treatment plants' AKART analyses and monitoring to assess reasonable potential and include water quality-based numeric nutrient effluent limits where needed.

2. Anti-backsliding and interaction between existing individual permits with nutrient limits. Please clarify how anti-backsliding will be considered for facilities with existing individual permits that have numeric nutrient limits or different monitoring parameters or frequencies than in the proposed nutrient general permit.

3. Total Nitrogen versus Total Inorganic Nitrogen. Please clarify why total inorganic nitrogen is being used rather than total nitrogen in the permit.

4. AKART. Please describe why 3 mg/L was selected for facility planning.
No attachments

Comment From: Northshore Utility District (Alan Nelson)

8/13/21 @ 7:53 AM
Please see comment letter attached.
Attachments:

Comment From: City of Bellingham (Steve Bradshaw)

8/12/21 @ 4:41 PM
Please see the attached file for City of Bellingham comments on the 2021 Draft Puget Sound Nutrient General Permit
Attachments:

Comment From: Port Gamble S'Klallam (Josh Carter)

8/12/21 @ 3:51 PM
See attached. Please note I accidentally submitted this previously without our identifying information above.
Attachments:

Comment From: Anonymous Anonymous

8/12/21 @ 3:49 PM
See attached.
Attachments:

Comment From: Jim Voetberg

8/12/21 @ 1:05 PM
Attachments:

Comment From: Seattle Public Utilities (Andrew Lee )

8/12/21 @ 11:56 AM
Please see the attached file for Seattle Public Utilities comments on the 2021 Draft Puget Sound Nutrient General Permit.
Attachments:

Comment From: City of Auburn (Lisa Tobin)

8/12/21 @ 9:07 AM
The City of Auburn (Auburn) supports Ecology's objective to improve water quality in the Salish Sea to improve the habitat for marine life. The intent of the Nutrient Reduction Plan currently being developed could be an important tool to assess the ...↓
Auburn contracts with King County Department of Natural Resources for wastewater treatment and disposal. We request that the Department of Ecology consider the following revisions to the Draft Nutrient General Permit, based on an assumed Permit effective date of January 1, 2022:

Section S4.C.1.b allows King County to exclude optimization strategies that exceed a reasonable implementation cost ("reasonable" is not defined) and one year implementation timeframe. Optimization strategies that meet the cost and timing criteria may not be feasible given the size, complexity, flows, nutrient loading, and space limitations King County's wastewater treatment plants. There is no indication in the Draft Permit of what an agency is to do if there are no feasible optimization strategies that meet these criteria.

Section S4.C.1.c requires King County to select an optimization strategy by May 1, 2022 (within 4 months) and implement it by March 31, 2023 (11 months later). Any strategy that can achieve a significant reduction in the Total Inorganic Nitrogen (TIN) from King County's 3 large treatment plants will likely involve construction of nutrient reduction facilities, which is unlikely in such a short time frame. In addition, King County believes that it will exceed its nutrient limits starting in 2022, which will then trigger the 10% reduction (Section S4.D.1.c) in TIN by 2027. For the West Point plant with its limited available space, TIN reduction may require siting, design and construction of pump stations to divert the flows to the other two treatment plants or a new treatment plant. Neither the pump stations nor the treatment plant could be constructed within that time frame.

Section S4.C.3 (source control) describes measures to reduce influent nitrogen from new multi-family residential and commercial building and from septage handling. Such measures will take several years to implement, requiring regulatory changes across many jurisdictions. Restrictions on septage handling may result in illegal discharges to sewer manholes or the environment. This should be an optional, not required, component, and additional time should be provided to evaluate these measures.

Delete Section S4.D.c (engineering report) and instead place the focus on the Nutrient Reduction Evaluation in Section S4.E, which will provide a comprehensive evaluation about feasibility, effectiveness, and cost of various measures. The Nutrient Reduction Evaluation should precede implementation of any strategies.

Auburn believes that additional time is needed to complete the comprehensive Nutrient Reduction Plan, to evaluate and compare the results of various models (e.g., the Salish Sea model, the Puget Sound model, models that address river and stream discharges, etc.), to explore alternative actions, and to collaborate to develop a balanced, regional plan supported by all stakeholders. While improving the water quality of the Salish Sea is an important goal, the region cannot afford to take actions that stifle economic recovery in the wake of the pandemic, require unaffordable sewer rates, and result in building moratoriums to prevent increases in nutrient loadings.
No attachments

Comment From: Seattle Aquarium (Robert W. Davidson)

8/12/21 @ 7:53 AM
Please see attached comment letter from the Seattle Aquarium.
Attachments:

Comment From: Washington Environmental Counc...

8/11/21 @ 4:04 PM
Attachments:

Comment From: Lakehaven Water and Sewer Dist... (John Barton)

8/11/21 @ 3:04 PM
Attachments:

Comment From: Midway Sewer District (Marc Montieth)

8/11/21 @ 2:32 PM
Attachments:

Comment From: Cory Prusha

8/11/21 @ 11:54 AM
The current city of Oak Harbor outfall is 003. Table 8 has listed outfall 002 which was handed back to the US navy base at the end of 2018.

Thank you,
Cory
No attachments

Comment From: Steve Hitch

8/10/21 @ 3:19 PM
Redmond is submitting a letter with comments that describe Redmond's concerns and recommendations as they relate to the draft Puget Sound Nutrient General Permit.
Attachments:

Comment From: City of Tukwila (Allan Ekberg)

8/10/21 @ 1:22 PM
Please see the attached comment letter from the City of Tukwila.
Attachments:

Comment From: Washington Association of Sewe... (Judi Gladstone)

8/09/21 @ 2:57 PM
Attachments:

Comment From: RE Sources (Kirsten McDade)

8/09/21 @ 11:22 AM
Please see attached comment letter
Attachments:

Comment From: BHC Consultants (Tom Giese)

8/09/21 @ 9:14 AM
Attachments:

Comment From: Jamestown Tribe (Hansi Hals)

8/09/21 @ 8:20 AM
Attachments:

Comment From: John Marshall

8/08/21 @ 12:22 PM
Ecology should encourage urine separation at the source to reduce nitrogen discharges to Puget Sound. Urine contains eighty percent of the nitrogen and fifty percent of the phosphorus in domestic wastewater. Separation is scalable as needed and can...↓
No attachments

Comment From: City of Mercer Island

8/05/21 @ 4:53 PM
Request to Delay Puget Sound Nutrient General Permit (PSNGP) Permit Issuance

The City of Mercer Island requests that the Washington State Department of Ecology (Ecology) delay the issuance of the draft Puget Sound Nutrient General Permit (PSNGP) for m...↓
Attachments:

Comment From: Sammamish Plateau Water (John Krauss)

8/04/21 @ 3:49 PM
Sammamish Plateau Water's comments are in the uploaded PDF file.
Attachments:

Comment From: Brenda Limric

8/04/21 @ 1:54 PM
I am all for clean water and cleaning up Puget Sound. I am concerned about how this is going to be paid for. Passing the entire cost to the homeowners is going to be a huge economic burden for many of us that are just getting by as it is.
No attachments

Comment From: Michael Koslosky

8/02/21 @ 6:24 PM
Puget Sound is a dynamic body of water supporting untold numbers of organisms from our resident Orca to microscopic nanoplankton. This living ecosystem needs protection from excess nutrients in order to function at optimal levels now and into the fut...↓
No attachments

Comment From: Lake Whatcom Water and Sewer D... (Justin Clary)

7/28/21 @ 1:18 PM
Attachments:

Comment From: City of Bothell (Erin Leonhart)

7/22/21 @ 9:37 AM
I am writing to share the City Bothell's concerns about the Washington State Department of Ecology's (Ecology) draft Puget Sound Nutrient General Permit (PSNGP) for municipal wastewater treatment facilities that discharge into Puget Sound. It is our...↓

The City of Bothell sewer utility strives to provide safe, affordable, and equitable wastewater collection and conveyance prior to wholesale treatment by the King County Wastewater Treatment Division and discharge to Puget Sound. The City's sewer systems is relatively new, with the majority installed or upgraded within the last few decades, and does not incorporate stormwater discharge that can lead to Combined Sewer Overflow (CSO) events and associated release of nutrient rich effluent into Puget Sound. Bothell maintains a rigorous sewer system maintenance and improvement program to reduce Infiltration and Inflow, along with water conservation measures and stringent construction inspection that directly reduce wastewater discharge flow rates. In addition, the City has invested significantly in Capital Projects to further improve the sewer system including installation of 0.8 miles of Cure In Place Pipe (CIPP) sewer main rehabilitation in 2019 and reconstruction of all of City's sewer lift in the last 10 years with updated pumps, back-up generators, and redundant systems to ensure zero overflows into the natural ecosystem. Bothell is already invested heavily in sewer utility improvements to decrease potential service and environmental impacts. Issuance of the draft PSNGP requirements will result in an unreasonable economic burden on the City's sewer utility and ratepayers.

The City recognizes Ecology's responsibility to maintain compliance with water quality standards and to address dissolved oxygen (DO) impairment in sensitive areas of the Sound. The City shares Ecology's goal; however, we do not have sufficient information to support the PSNGP as proposed by Ecology.

The science does not support issuance of the PSNGP at this time. There remain significant scientific uncertainties associated with understanding DO depletions in Puget Sound and use of the Salish Sea Model as the tool to support regulatory requirements. The Puget Sound is a complex ecosystem that needs to be studied and evaluated by a body of experts. Additionally, Ecology has not fully considered the environmental trade-offs, such as the increase in greenhouse gas emissions that occurs with increased nitrogen removal.

The PSNGP, as proposed by Ecology, will have significant economic impacts on residents and business owners in this region. Ecology needs to assess the economic impacts of the PSNGP to ensure decision-makers are well informed on what the costs to residents and businesses will be. City of Bothell residents and businesses served by King County wastewater treatment facilities could see rate increases three times greater than current rates to comply with the PSNGP as proposed. Given the regional need to tackle stormwater, habitat restoration, and other actions necessary for Puget Sound recovery, Ecology should recognize the cost of all of these environmental projects and prioritize those projects with the greatest water quality benefit.

King County is already not affordable for many residents and businesses. We have complied with the Growth Management Act and focused growth within the urban growth boundary, resulting in dense urban neighborhoods and significant investment in sewer utility infrastructure and associated maintenance. Significantly increased sewer rates resulting from the draft PSNGP requirements could cause residents to move elsewhere and businesses to relocate. We do not want to see any further displacement. We want to maintain affordability for residents and businesses in this region.

Ecology should fully explore alternatives. Ecology should explore alternative approaches to improving Puget Sound water quality. For example, an alternative approach should initially focus on shallow bays where dissolved oxygen is most problematic. This would be faster and achieve the most impactful water quality benefit more quickly. Nitrogen removal is a huge investment for this region. We strongly support the restoration of Puget Sound, but Ecology has not fully explored alternatives that would lead to a greater water quality benefit. We do not have sufficient information yet from Ecology to justify this kind of significant investment to residents and business owners.

Thank you in advance for your consideration of our comments. Again, I want to emphasize the importance of delaying issuance of the PSNGP until the modelling and data on nutrients are well understood, the alternatives fully evaluated, and the economic impacts better understood. If you have any questions, please feel free to contact Interim Public Works Director Eddie Low anytime at eddie.low@bothellwa.gov.

Attachments:

Comment From: beabeachwatcher@gmail.com Anonymous

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkNutrient Email Ellie Ott,I am writing to object to Ecology’s ...↓
No attachments

Comment From: Megan Hartz

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkNutrient Email Ellie Ott,I am writing to object to Ecology’s ...↓
No attachments

Comment From: Darcy Carlson

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Hannah Carpenter

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Denise Lytle

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Leila Mohseni

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Alex Zecha

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Tracy Ouellette

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Jean Richardson

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: David Cunningham

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Gary Bornzin

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Dennis Bahr

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Nicholas Barcott

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Alison Merz

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Liisa Wale

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Megan Warren

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Virginia Davis

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Anna Esquibel

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Kim Kosa

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Wendy James

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

Comment From: Suzanne Mitten-Lewis

7/22/21 @ 12:00 AM
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the linkDear Ms. Eleanor Ott,I support the Department of Ecology in i...↓
No attachments

[ Previous Page / Next Page ]