2024 Phase I & Phase II Formal Draft Comment Period

108 Results

Sort:

Comment From: Jan Molinaro

10/26/23 @ 11:51 AM
The Washington State Department of Ecology is proposing a new rule in the 2024 Stormwater Management Manual for Western Washington relating to road projects. The draft rule requires road replacement projects greater than 5,000 ft2 to add treatment fa...↓
No attachments

Comment From: Alice Cords

10/26/23 @ 9:54 AM
This comment is related to the Phase II Western WA Municipal Stormwater Draft Permit. We are a secondary permittee. There is a concern about the timing of being required to submit the updated Stormwater Management Plan at the same time of year as t...↓
No attachments

Comment From: Clint Wise

10/23/23 @ 7:39 AM
Volume III

For Continuous Simulation Model Please consider Autodesk's Storm and Sanitary Analysis as APPROVED, as it is included in every Civil 3D installation and is a very good tool that greatly facilitates design back and forth from modeling to p...↓
No attachments

Comment From: John Marshall

10/21/23 @ 8:16 AM
What information or runoff studies informed Ecology's decision that light rail discharges are pollution generating and require enhanced treatment? Show me the data!

Will Ecology issue Sound Transit an individual NPDES permit requiring monitoring ma...↓
No attachments

Comment From: Frank Marescalco

10/16/23 @ 10:42 PM
Comments attached as PDF
Attachments:

Comment From: Rhett Winter

10/03/23 @ 2:23 PM
See attached excel file
Attachments:

Comment From: Eldon Rickman

9/13/23 @ 6:36 AM
Attachments:

Comment From: Anonymous Anonymous

8/22/23 @ 1:27 PM
How are we supposed to determine if a building was built or renovated between 1950-1980, a lot of these older buildings do not have available plans.
No attachments

[ Previous Page / Next Page ]