South State Street Manufactured Gas Plant: Environmental Report (Public Comment Period: Oct. 8 - Nov. 6, 2018)

5 Results

Sort:

Comment From: Eleanor Hines

11/06/18 @ 8:30 AM
Attachments:

Comment From: Department of Natural Resource... (Timothy Goodman)

11/06/18 @ 4:29 AM
The Washington State Department of Natural Resources (DNR) is pleased to provide the following comments on the SSS MGP RI/FS September 26, 2018 Public Review Draft Feasibility Study. DNR requests that the Feasibility Study be expanded to include s...↓
No attachments

Comment From: Judith Akins

11/05/18 @ 12:05 PM
I am a resident of Bellingham and regularly use this trail both for walking and biking. I find that keeping the blackberries on the upland site and fencing this area off is appalling, to say the least. I have picked blackberries here and I don't thin...↓
No attachments

Comment From: Bruce Peters

10/24/18 @ 1:29 PM
Will the pedestrian overpass over the railroad tracks be rebuilt as part of this project?
No attachments

Comment From: Monte Hokanson

10/10/18 @ 4:35 AM
Surface water flooding is the most common cause of flooding and one of the greatest short-term climate change risks facing the NorthWest. Consider diverting contaminated surface and ground water seepage from the Manufactured Gas Plant clean-up sit...↓
No attachments