Commenting open: August 14, 2026 12:00AM PT - October 13, 2026 11:59PM PT.
Advanced Modular Pretreatment System - Class 3 permit modification
The U.S. Department of Energy is holding a 60-day public comment period and meeting on a proposed Class 3 permit modification to the Hanford Dangerous Waste Permit. If approved, the modification would allow the Advanced Modular Pretreatment System (AMPS) to be added to the permit for the Low-Activity Waste Pretreatment System Operable Unit Group. Additional capabilities are needed to ensure the Waste Treatment and Immobilization Plant can operate continuously. AMPS would supplement the existing Tank-Side Cesium Removal System.
Please note that this comment form is for the purpose of submitting a comment to the Washington State Department of Ecology. Commenter contact information is optional. Contact information is necessary if you want to receive future notices or responses related to this topic.
Contact Information
*Indicates Required Fields
Thank you for subscribing to the Advanced Modular Pretreatment System - Class 3 permit modification mailing list.
The U.S. Department of Energy is holding a 60-day public comment period and meeting on a proposed Class 3 permit modification to the Hanford Dangerous Waste Permit. If approved, the modification would allow the Advanced Modular Pretreatment System (AMPS) to be added to the permit for the Low-Activity Waste Pretreatment System Operable Unit Group. Additional capabilities are needed to ensure the Waste Treatment and Immobilization Plant can operate continuously. AMPS would supplement the existing Tank-Side Cesium Removal System.
Please note that this comment form is for the purpose of submitting a comment to the Washington State Department of Ecology. Commenter contact information is optional. Contact information is necessary if you want to receive future notices or responses related to this topic.
Contact Information
*Indicates Required Fields